Laserfiche WebLink
_ INSPECTION REPORT <br /> Date � l � Per'rnit:��D�j—��� <br /> Contractor: ��5��`� <br /> Owner: 5���(Q,,S�.Q. <br /> .�---2 <br /> Site Address:�(�� ��� � �. <br /> TYPE OF WSPECTION REQUESTED <br /> ELECTRiCAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough in ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywali Nailing ❑Piumbing Final <br /> �ctrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OT OR CONSULTATtON:�� -1 l T,�" f-I� <br /> P ROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THI MIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: _ <br /> ❑ CALL(425)257-8881 FOR REWSPECTION—24 hour notice required <br /> � �J l.� �''� <br /> �� <br /> ��� � <br /> Inspector: Date: <br /> EIR(10/06) DATABAR,INC. <br />