My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1118 80TH ST SW BASE FILE 2019-12-11
>
Address Records
>
80TH ST SW
>
1118
>
BASE FILE
>
1118 80TH ST SW BASE FILE 2019-12-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2019 2:27:36 PM
Creation date
11/29/2016 1:18:50 PM
Metadata
Fields
Template:
Address Document
Street Name
80TH ST SW
Street Number
1118
Tenant Name
BASE FILE
Notes
PEPSI COLA BOTTLING CO
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SINGLE-PLY SYSTEMS, INC. <br /> NATIONAL COMMERCIAL ROOFING CONTRACTOR <br /> BUILDING OWNER: Pepsi Bottling Group,LLC <br /> 1111 Westchester Avenue <br /> White Plains,NY 10604 <br /> PEPSICO <br /> 1118 80th Street Southwest <br /> Everett,WA 98203 <br /> APPROXIMATELY 44,148 SQUARE FEET <br /> SCOPE OF WORK: <br /> 1. Retain existing standing seam metal roof and clean of all debris. <br /> 2. Infill existing flutes with Johns Manville 1"Polyisocyanurate urethane insulation loose <br /> laid. <br /> 3. Install Johns Manville 1.5"Polyisocyanurate board over the EPS insulation and <br /> mechanically fasten it to the existing decking with 6 fasteners per 4'x8'board. <br /> 4. Install 60 Mil.Johns Manville white TPO,scrim reinforced,mechanically fastened <br /> roof membrane and roof flashing system as per manufacturer's specifications. <br /> 5. New TPO to be fastened into the existing purlins spaced 5' apart. (Sheets to be 10'wide <br /> fastened 18"o.c.in the field, 12"in the perimeters and 6"in the corners.) <br /> 6. Install wood nailers at the perimeter to accommodate the new insulation. <br /> 7. Flash all roof top curbs,and pipes per manufacturers approved details. <br /> 8. Wrap all perimeter edge walls with fully adhered membrane. Membrane to extend over <br /> the outside face of wall a minimum of 1.5"below wood nailer.Apply continuous bead of <br /> NP-1 sealant between face of wall and membrane. <br /> 9. Install new prefinished 24 gauge Metal-Era Anchor Tite Canted Waterdam perimeter <br /> metal. <br /> 10. Install new Metal-Era SealTite gutter and downspout to match the existing. <br /> 11. Replace existing(12) Smoke Vents with new Factory Mutual approved Bristolite <br /> Kingspan 4896-ECO-SVAPC Smoke Vent and Gladiator Safety Screen 4896-SSCRN. <br /> 12.Furnish and install(28)Velux Dynamic Dome Skylight Factory Mutual Approved Model <br /> Size 6072 and AES Industries metal curb. <br /> 13. Remove and dispose of all debris related to the roofmg project. <br /> 14. Shall cover, seal and otherwise protect the roof and all flashing so that water cannot <br /> accumulate or flow under completed portions.When and where required,temporary <br /> water cutoffs shall be made at the end of each working day. <br /> 15. Upon completion and inspection by an authorized Johns Manville Technical inspector, <br /> Furnish a manufacturer's 15 year labor and material NDL warranty. <br /> TOTAL Price(Snit -TaxTncl__ c ) $346,800-90 <br /> 3/6./ 039 - )Jrv <br /> ccubi -O <br /> Corporate Headquarters: 10951 Nesbitt Ave S.,Bloomington,MN 55437 / I��q <br /> Phone: (651)688-7554 Website: www.singleplysystems.com Fax No.: (651)688-9092 r <br />
The URL can be used to link to this page
Your browser does not support the video tag.