Laserfiche WebLink
SECTION I — PROJECT DESCRIPTION <br />The proposed Trailside Village Maintenance project is located at 1300 100th PI SE in Everett, <br />Washington. The project consists of the replacement of portions of existing walkways, <br />construction of small areas of new walkway, and overlaying of portions of existing parking lots <br />to create ADA compliant parking stalls and load areas. The proposed redevelopment is designed <br />to meet the requirements of the 2010 Everett Stormwater Management Manual. <br />See attached figure 2.1 and 2.2 following this section for the flow chart used in determining the <br />minimum and additional requirements. <br />The areas of proposed redevelopment account for 0.046 acres of the 13.42 acre parcel. <br />The following list summarizes the areas of improvements: <br />• Approximately 180 SF of new cement concrete sidewalk <br />• Approximately 1812 SF of replaced cement concrete sidewalk <br />• Approximately 7200 SF of ACP parking lot overlay. <br />Stormwater runoff from the proposed improvements will be collected via existing stormwater <br />structures. There is no drainage system work included in this project. <br />Trailside Village Apts Page 2 Proj. # 16009 <br />SSP Report Sitewise Design PLLC <br />