My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1907 112TH PL SE 2017-01-13
>
Address Records
>
112TH PL SE
>
1907
>
1907 112TH PL SE 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 4:43:03 PM
Creation date
11/30/2016 9:33:06 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH PL SE
Street Number
1907
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />, r <br />. C � <br />�.'`fi- tt i�s�� i� 4 Sy <br />.'_ ; �Qlution�; <br />��;��; <br />�� �l�I�K�x��°��� <br />_��� <br />E��ti� SOIt��:i€�rts I��l LLC: <br />February 9, 2016 <br />ES-3588.01 <br />Polygon Northwest <br />PO Box 1349 <br />Bellevue, Washington 98009 <br />Attention <br />Subject: <br />Mr. Thomas Heinz <br />Final Report— Building 12, �ots 12.1, 12.2, 12.3, and 12.4 <br />Construction Monitoring and Consulting Services <br />• t;eotnchnical Eno�r�ecrinb <br />° Construction Monitoring <br />9 Environmenial Sciences <br />Silver Lake Center <br />1905, 1907, 1909, and 1911 —112t" PEace Southeast <br />Everett, Washington <br />City of Everett Permits C1 411-083, C1 411-084, C1 4'01-0$5, and C1 411-086 <br />Dear Mr. Heinz: <br />In accordance with your request, Earth Solutions NW, LLC (ESNW) provided construction <br />manitoring and consulting services at the subject site. Our services included providing onsite <br />observations and testing on a part-time from April 28, 2015 to January 8, 2016. Our <br />representatives made five site visits to observe or test building foundation subgrade, building <br />slab backfill, and pervious pavemenfi preparation. <br />Our representative observed building foundation subgrade to be dense and suitable for suppo�t <br />of the proposed structure. <br />Our representative conducted eight field density fests in accordance with ASTiUI Test <br />Designation D2922 �Nuclear Gauge Method). Two representative soil samples were returned <br />to our laboratory for analysis of #he maximum dry density and optimum moisture content in <br />accordance with ASTfVI D1557-02 (Modified Proctor}. Density test results indicate adequate <br />compaction of at least 95 percent at the tested locations af the building slab backfill. <br />Our representative abserved the contractor prepare the driveway far pervious pavement <br />according to the specification in the designed plans. In accardance with the designed plans, <br />our representative conducted the bucket test on the pervious pavement and observed it to <br />drain as intended. <br />180� - i36th 1 i�re N.F., Sui<<: 2(.��i �(�cll�, uc; 1�1!? 930��:> � t-f _�i; ,F i�) -+7(;� � f,4X r'f�'.a) -;-+�;-4; �11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.