|
u
<br />¢�HA�
<br />� � ���� �� .� �
<br />h �j
<br />z
<br />SL � f�F�'i�:�� ��.
<br />`r,NG L'.NGVIdE'G.
<br />Eddy Stevens
<br />Silverlake Center, LLC
<br />P.O. Box 1349
<br />Bellevue, WA 98009
<br />u
<br />civu �nc!NeE�riinic. t a�vo ��aNN!Nn, suRv�-viNc
<br />December 14, 2015
<br />Eddy.stevens@Polygnnhomes.com
<br />RE: Final Letter for Building 13
<br />Silverlake Center
<br />1920, 1918, 1916, 1914, 1912, 1910 - 112th PI SE: Everett, Washington
<br />Our Job No. 19780
<br />Based on our periodic inspections, it appears that the Interior and Exterior Shear, Frame, Building Wrap,
<br />Window Wrap, Lateral Bracing, Roof and Exierior Final for Building 13 at Silverlake Center is in
<br />substantial compliance with RCW 64.55 and is in substantial compliance with the approved drawings
<br />(based on pians prepared by Milbrandt Architects dated February 4, 2015).
<br />If you have any questions or need additional information, please contact me at this office. Thank you.
<br />Respectfully,
<br />� ;��
<br />,,�. � �,,�,-��',�.�-�'�+.�"°'�«---�--�- .,_ w_____ _—
<br />� ���Hal P. Grubb, P.E.
<br />Director of Engineering Services
<br />HPG/ns
<br />19780c.015.doc
<br />cc: Ron Smith, Polygon Homes
<br />,leff Jacobsen, Polygon Homes (via emaiQ
<br />Thomas Heinz, Polygon Homes (vra email)
<br />Frank Mellas, Sound Inspections, LLC (via email)
<br />Nancy Scott, Barghausen Consulting Engineers, Inc
<br />�P�, p. �/��e
<br />Da ee,�se�� 6
<br />4``�• ���.
<br />s
<br />�' � � �
<br />s `.
<br />�. � �, , C
<br />� , j.�: � �.
<br />��, k�.23975 0, :��
<br />R�S, �'ts�t.�i� C�,�
<br />�4P��'0':11. �••
<br />7 8?_15 72MD AVENUE 50UTH KENi, WA 9i3032 (425) 251-6222 (425) 251-H78?_ FAX
<br />BRANCM QFFICES • TUMWATER, WA • LONG BEACH, CA • R05EVILLE, CA ^ SAN DIEGO, CA
<br />www.barghausen.com
<br />
|