|
Eddy Stevens
<br />Silverlake Center, LLC
<br />P.O. Box 1349
<br />Bellevue, WA 98009
<br />CIVIL GNGW6ERING, LHI�ID PLANN!NG, iURVFYING
<br />December 14, 2015
<br />Eddy.stevens@Polygenhomes.com
<br />RE: Final Letter for Building 13
<br />Silverlake Center
<br />1920, 1918, 1916, 1914, 1912, 1910 - 112th PI SE, Everett, Washingtan
<br />�ur Job No. 19780
<br />Based on our periodic inspections, it appears that the Interior and Exterior Shear, Frame, Building Wrap,
<br />Window Wrap, Lateral Bracing, Roof and Exterior Final for Building 13 at Siiverlake Center is in
<br />substantia! compliance with RCW 64.55 and is in substantial compiiance with the approved drawings
<br />(based on plans prepared by Milbrandt Architects dated February 4, 2015).
<br />If you have any questions or need additional information, please contac# me at this office. Thank you.
<br />Respectfully,
<br />� ��
<br />;� ��..,� rt __�__.�--___.
<br />i;;.,,... ,��,.
<br />. ,.�
<br />�� �--�.......,�
<br />Hal P. Grubb, P.E.
<br />Director of Engineering Services
<br />� II'G/�i<>
<br />19780c.015.doc
<br />cc: Ron Smith, Polygon Homes
<br />Jeff Jacobsen, Polygon Homes (via emarl)
<br />Thomas Heinz, Polygon Homes (via email)
<br />Frank Mellas, Sound Inspections, LLC (via email)
<br />Nancy Scott, Barghausen Consulting Engineers, Inc
<br />��P�, S1: uf���,
<br />c�y� oens��� e
<br />qC' �r•.
<br />`�� J
<br />� � �� �
<br />�. � �, �
<br />� �. .. ,�
<br />�,e, kF.239�5 �, ;�,
<br />�S,S�t e�ti.��`C�
<br />18?_15 72ND AVERlUE SOUTH KENT, WA 9i3032 (425) 251-6222 (425) 251-8782 FAX
<br />BRANCH O�FICES � TUMWATER, WA • LONG [3EACH, CA • ROSEVILLE, CA > SAN DIEGO, CA
<br />www.baryhausen.com
<br />
|