|
Eddy Stevens
<br />Silverlake Center, LLC
<br />P.O. Box 1349
<br />Bellevue, WA 98009
<br />CIVII_ GNGINGEPIIhlG, 1_HfJD'��LANN!NG, iURVF-YIfVG
<br />December 14, 2015
<br />Eddy.stevens@Polygonhomes.com
<br />RE: Final Letter for Buiiding 13
<br />Silverlake Center
<br />1920, 1918, 1916, 1914, 1912, 1910 - 112th PI SE, Everett, Washington
<br />Our Job No. 19780
<br />Based on our periodic inspections, it appears that the Interior and Exterior Shear, Frame, Building Wrap,
<br />Window Wrap, Latera( Bracing, Roof and Exterior Final for Building 13 at 5ilverlake Center is in
<br />substantial compliance with RCW 64.55 and is in substantial compliance with the approved drawings
<br />(based on plans prepared by Milbrandt Architects dated February 4, 2015).
<br />If you have any questians or need additional information, please contact me at this office. Thank you.
<br />Respectfully,
<br />3�/'�,..,, � . /..,,�.,�✓ � �4�....�-. . __�......�_._.___._.__...
<br />�', �^'_--.....�.«�'��M
<br />Hal P. Grubb, P.E.
<br />Director of Engineering Services
<br />� IPG/ns
<br />19780c.015.cioc
<br />cc: Ron Smith, Polygon Nomes
<br />Jeff Jacobsen, Polygon Homes (vra email)
<br />Thomas Heinz, Polygon Homes (via emai!)
<br />Frank Mellas, Sound Inspections, LLC (via email)
<br />Nancy Scott, Barghausen Consulting Engineers, Inc.
<br />����,i�. �:;r��; 'A
<br />�"•"k e�_tis������
<br />'�'� 1
<br />�; � �. ��,..
<br />� � �' � �'
<br />�: �
<br />�
<br />G�kF, 23475 �, ,K �
<br />�'S, �°ltiTl�.1i�� �,'1:
<br />S�C)!�':11.1' `
<br />18215 72ND AVENUE SOUTH KENT, WA 9F3032 (425) 251-G222 (425) 251-5782 fAX
<br />BRANCN dFFiCE5 > TUMWATER, WA • LONG BEACH, CA • ROSEVILLE, CA • SAN DIEUO, CFl
<br />www.barghausen.com
<br />b/b
<br />
|