My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1924 112TH PL SE 2017-01-13
>
Address Records
>
112TH PL SE
>
1924
>
1924 112TH PL SE 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 4:58:27 PM
Creation date
11/30/2016 11:21:47 AM
Metadata
Fields
Template:
Address Document
Street Name
112TH PL SE
Street Number
1924
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />�'� <br />�� <br />1 <br />`t �w'� <br />� <br />• <br />• <br />January 5, �:016 <br />ES-3588.01 <br />Polygon Noi�thwest <br />PO Box 1349 <br />Bellevue, W'ashington 98009 <br />Attention: Mr. Thomas Heinz <br />•, �di`t�1, ;; <br />���Salu#� ��� <br />�� <br />N�!x�� <br />Eart� Solutions NW ��c; <br />• Grntechr�ic_al hay;ineerin,�; <br />• C�t>nslrudion Monitc�rin�, <br />• �i�vir��rzrnenlal Scicrir:cs <br />Subject: Final Report — Building 14, Lots 14.1 thru 14.5 <br />Construction Monitoring and Consulting Services <br />Silver Lake Center <br />1930, 1928, 1926, 1924, and 1922 —112t" Place Southeast <br />Everett, Washington <br />City of Everett Permits C1411-033, C1411-032, C1411-031, C1411-030, <br />C1411-24 <br />Dear Mr. HE:inz: <br />In accordarice with your request, Earth Solutions NW, LLC (ESNW) provided construction <br />monitoring s�nd consulting services at the subject site. Our services included providing onsite <br />observations and testing on a part-time from April 14 to July 28, 2015. Our representatives <br />made six sii:e visits to observe and test the building foundation subgrade. <br />Our represe:ntative observed building foundation subgrade to be dense and suitable for support <br />of the propc�sed structure. <br />Our repres��ntative conducted thirteen field density tests in accordance with ASTM Test <br />Designation D2922 (Nuclear Gauge Method). Two representative soil samples were returned <br />to our labo��atory for analysis of the maximum dry density and optimum moisture content in <br />accordance with ASTM D1557-02 (Modified Proctor). Density test results indicate adequate <br />compaction of at least 95 percent at the tested locations of the building slab backfill. <br />Based on our observations and testing, the earthwark construction was accomplished in <br />accordance with the project plans and our geotechnical recommendations. <br />_ <br />1`r�i)�i � 3F�1i1 �'.i�,� i�Lf , 5.�,1:� _ i.l • :iz�� � .�c�, `v`�',� `�FiiiU � �,�?51 k-���- 7.i', � i�rl�, t 4 .�d�y �+, � <br />��b <br />
The URL can be used to link to this page
Your browser does not support the video tag.