|
.,�
<br />Eddy Stevens
<br />Silverlake Center, LLC
<br />P.O. Box 1349
<br />Bellevue, WA 98009
<br />u
<br />C�V;L ENGm�PFR�rJr;. � nNr) r'LaNNn�x;. SURVFv�n!s
<br />January 6, 2016
<br />Eddy.stevens@Polygonhomes.com
<br />RE: Final Letter fior Building 14
<br />Silverlake Cer�ter
<br />193�, 1928, 1926, 1924, 1922 - 112th PI SE, Everett, Washington
<br />Our Job No. 19780
<br />Based on our periodic inspections; it appears that the Interfor and Exterior Shear, Frame, Building Wrap,
<br />Window Wrap, Lateral Bracing, Roof and Exterior Final for Building 14 at Silverlake Center is in
<br />substantial compliance with RCW 64.55 and is in substantial compiiance with the approved drawings
<br />(based on plans prepared by Milbrandt Architects dateci February 4, Z015).
<br />If you have any questians or need additional information, please contact me at this office. Thank you.
<br />t�espectfully,
<br />�+...-��r[�r '�� ,,,.,,�-
<br />Hal P. Grubb, P.E.
<br />Directnr of Engir7e�ring Services
<br />HPG/ns
<br />19780c.016.doc
<br />cc: Ron Smith, Polygon Homes
<br />Jeff Jacohsen, Polygon Homes (via email)
<br />Thomas Heinz, Polygan Homes (vra er��arl)
<br />Frank Meilas, Sound Inspections, LLC (via emai!)
<br />Nancy Scott, Bargt7ausen Consulting Engineers, Inc.
<br />��,,, P• �RV �
<br />A ��� at,�mOg,
<br />ti •,r•.
<br />�� P
<br />�� J�'
<br />: � • V'
<br />� ` ;�
<br />�O� ,y.�, 23975 ��, <c�,
<br />R� , r'tsl F.� 0�
<br />'S.1/()., :l A. 0 �`
<br />1II215 72N(� AVLNU[ SOU��N P<ENT. UV/L 98�J32 (42;i� 2 r1-6222 (4251 2.`i1-37�32 f=AX
<br />k�RANCH C>f-FICES • l-UMW/1TER, W/� < l.OiVG BEACN, C;� • ROSEVII_L.E, (.;�1 ^ SAN DIEGO, CA
<br />www.bargf}ause�n.com
<br />b'b
<br />
|