My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2414 BAKER AVE 2017-01-13
>
Address Records
>
BAKER AVE
>
2414
>
2414 BAKER AVE 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 5:08:18 PM
Creation date
11/30/2016 1:53:30 PM
Metadata
Fields
Template:
Address Document
Street Name
BAKER AVE
Street Number
2414
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEC�TECH <br />CONSULT�NTS, INC. <br />Tom Eiden <br />2414 Baker Avenue North <br />Everett, Washington 98122 <br />Subject: Geotechnical Engineering Stucly <br />Proposed Eiden Garage <br />2414 Baker Avenue North <br />Everett, Washington <br />Dear Mr. Eiden- <br />13256 NorCheast 20th Street, Suite 16 <br />Bellevue, Washiilgton 98005 <br />(425) 747-5618 FAX (425) 747-8567 <br />June 21, 2010 <br />JN 10114 <br />via email: <br />This report presents the findings and recommendations of our geotechnical engineering study for <br />the site of the proposed garage to be located in Everett, Washington. <br />No plans of the proposed garage were available for our review at the time of this report, but <br />through discussions with you, we understand that a new garage will be constructed in a similar <br />footprint to the existing garage/carport at the sife. The garage will be a single story, but will also <br />have a full basement. As a result, cuts on the order of 10 feet will be necessary to reach the <br />proposed bottom of excavation. The garage will be located a couple of feet from the alley and <br />approximately 5 feet from the northern property line. <br />If the scope of the project changes from what we have described above, we should be provided <br />with revised plans in ortler to determine if modifications to the recommendations and conclusions of <br />this report are warranted. <br />SfTE C�IVDITIDI�lS <br />SURFACE <br />The subject property is located in the central portion of Everett. The rectangular-shaped proper�y is <br />nearly flat and is ongrade with the surrounding properties. The alley that abuts the site to the west <br />is paved and the neighboring site to the north has a crushed rock parking area adjacent to the <br />proposed garage location. No neighboring structures are near the proposed garage. <br />SUBSURFACE <br />The subsurface conditions were explored by excavating a hand-auger test boring in the area just <br />south of the existing garage location. Our exploration program was based on the proposed <br />construction, anticipated subsurface conditions and those encountered during exploration, and the <br />scope of work outlined in our proposal. <br />The hand-auger boring was excavated on May 5, 2010 with a manual hand auger. A geotechnical <br />engineer from our staff observed the excavation process, logged the test borings, and obtained <br />representative samples of the soil encountered. The hand boring log is attached to this report as <br />Plate 2. <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.