My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5701 BEVERLY LN 2017-04-05
>
Address Records
>
BEVERLY LN
>
5701
>
5701 BEVERLY LN 2017-04-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2017 2:30:55 PM
Creation date
11/30/2016 2:36:49 PM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY LN
Street Number
5701
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date: <br />Public Works Permit #: <br />City of Everett Public Works Department <br />;-�,-t,; , 3200 Cedar Street Parent Permit #: <br />`�� � `�'� Everett, WA 98201 <br />Planning Reference #: <br />(425) 257-8810 <br />Public Works Fee $: <br />Other $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />MERANCYJOHN <br />5701 BEVERLY LN <br />EVERETT Wq <br />PHONE: 8235666103 <br />98203 <br />TAX PARCEL ID # 00471700004603 <br />BODINE CONSTRUCTION SERVICES <br />6009 212TH ST SW <br />LYNNWOOD Wq 98036 <br />PHONE: 2065105482 <br />SITE ADDRESS: 5701 BEVERLY LN <br />2/17/2016 <br />PW1602-029 <br />$ 110.00 <br />CURB DISCHARGE AND RESTORATION <br />RE-DO ALL DOWNSPOUT CONNECTIONS & TIGHTLINES. SAWCUT INTO SIDEWALK, INSTALL TWO <br />THROUGH-CURB DISCHARGE POINTS, REPLACE CURB AND SIDEWALK TO CITY OF EVERETT STANDARDS. <br />HIGHLAND ACRES BLK 000 D-03 - W <br />129.13FT OF S 87.91 FT OF LOT 46 <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />4. Site Civil Work to be done per plans approved by the City of Everett Public Works <br />Department dated 2/17/2016. w <br />5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior <br />to starting construction and with other inspection requests. [� <br />6. Install erosion control measures per City of Everett Standards for small parcels and � <br />remove upon completion of the project prior to final approval of the permit. <br />7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto � <br />roadway. O <br />8. Work on sidewalk to be done during daylight hours only. � <br />9. Curb discharge installation and associated curb & sidewalk restoration shall be <br />installed per COE Standard Drawing # 319: Residential Sidewalk Drain. � <br />10. All work shall be performed in accordance with the City of Everett's current Design O <br />and Construciton Standards and Specifications for Development. <br />Public Works Permit Fee Breakdown: <br />Paving (Curb & Sidewalk Restoration).....$45.00 <br />Misc. Minor Permits (Drainage Work).......$25.00 <br />PW Plan Review .......................................$20.00 <br />PW Site Inspection ....................................$20.00 <br />;''� <br />Appr�v�d fo Con�tru Date <br />� �� - �.�%� '- ��� - � � <br />.�-�� <br />FINAL INS CTION Date <br />Approved as Constructed <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harmless the <br />City of Everett from any and all claims for damages, costs, expenses, or <br />causes of action that may arise because of installation and maintenance of the <br />improvement or other right-of-way use hereto applied for and further agrees to <br />remove same upon notice from the City and to replace public property <br />damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CIIY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.