Laserfiche WebLink
�. <br />� TT <br />P���'� ����� ������ <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />KOZ EVCC LLC ? � � � �� � <br />�S'TE�1TH STREET, SUITE 201 <br />SNOHOMISH Wq 98290 <br />PHONE: 2067551290 <br />Date: 11 /3/2015 <br />Public Works Permit #: PW1511-006� <br />Building Permit #; B1509-025 <br />Planning Reference #: SEPA15-024 ; <br />F� <br />Public Works Fee $: $ 67,200.00 �`�� <br />Other $: <br />APPLICANT NAME AND ADDRESS: <br />KOZ EVCC LLC <br />1208 TENTH STREET, SUITE <br />��l%HOMISH Wq 98290 <br />PHONE: 2067551290 <br />TAX PARCEL ID # 29051700204700 I SITE ADDRESS: 1004 BROADWAY AVE <br />SITE WORK STUDENT HOUSING-ECC/TRAFFIC MITIGATION <br />��, <br />�"����� � <br />�. � <br />�� <br />SEC 17 TWP 29 RGE 05 <br />PERMIT CONDITIONS <br />'I. All calis for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 - ��-` � <br />' E�� '1 <br />f ." " ' <br />� ' <br />,..... <br />; <br />4. Install erosion control measures as determined by the Public Works Inspector, such as silt fence;-5traw.bales, <br />swales, or erosion blankets. �;=; _``� '� <br />,._., �-:�: <br />5. Remove erosion controi measures upon completion of the project prior to final approval of the pei`ri�it� ;_�; �'.` <br />6. No dirt, mud, rocks, or debris to be tracked onto roadway. _ ;�:; <br />7. If the curb ramp is damged during construction, th ramp shall be updated per ADA standard includin'g:.,the ramp <br />across the street. ._ <br />8. Construct per approived plan 10/28/2015. � <br />9.Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting::cdtis�ruction <br />and with other inspection requests. See attached to request an inspection. '= �;.';; �= � <br />�..:, ,� <br />Public Works Permit Fee Breakdown: �� �''�°°'' ��� <br />�Traffic Mitigation Fee $67,200.00 " "' " ==? �� <br />, , �- ;;:.:�,:. <br />�-::: ,•. <br />� <br />for Con <br />FINAL INSPECTION Date <br />Approved as Constructed <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the Ci1y and to replace ` ��,��/ <br />public property damaged thereby. ������ ���� ���,� ��,�?�k�-'J <br />���' .��� "%—,� / / J J� f �-�' � � <br />: <br />Signature of Applicant � Date <br />WORK AUTHORIZED BY THIS PERMIT MUST [3E STARTED WITHIN 1II0 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED 13Y THE CITY UPON ANY STOPPAGE OF WORK ON THIS PRO]ECT OVER 90 DAYS DURATION. <br />G a/`o a �, <br />