Laserfiche WebLink
T0: <br />PHONE: <br />EMAIL: <br />CC: <br />• <br />t�IRTLEY REQUEST FOR INFORMATION <br />� � L E Kirtley-Cole Associates LLC <br />GENERAL CONTRACTOR 15806-- KOZ EvCC Student Housing <br />Josh Scott <br />KOZ Development Inc <br />1208 10th St Suite 201 <br />Snohomish, WA 98290 <br />425-755-1290 <br />josh@kozdevelopment.com <br />Jason Andersen - KOZ Development Inc - <br />Phone: - Fax: <br />Gordon Cole - KOZ Development Inc - Phone: <br />Fax: <br />Page 1 of 1 <br />DATE: 10/30/2015 <br />RFI#: 010 <br />FROM: Brian Nupen <br />Kirtley-Cole Associates LLC <br />1010 SE Everett Mall Way Suite 102 <br />Everett, WA 98208 <br />PHONE: (425) 231-0569 <br />EMAIL: bnupen@kirtley-cole.com <br />Submitted: Requested by: Spec Section: Drawing #: Sub RFI No. RFI No. <br />_ _ _ _ - - - -- -- - - - - - - - <br />10/30/2015 11/0212015 C2.0 010 <br />SUBJECT: Moving Domestic Water Tap & RPBA into Room 031 Potential Cost: <br />Potential Delay: No <br />QUESTION: <br />To improve the exterior aesthetics of the project and improve maintainability, shall the 4" RPBA (per Std Dwg 518) <br />shown on sheet C2.0 be relocated into room 031 inside the building where the 3" RPBA was shown on the 90°/o <br />drawing P2.11 b? (Note that the Std Dwg 518 components shall be installed in a Std Dwg 523 configuration). <br />In speaking with Jim Spooner at the City of Everett, he has no problem with this concept, but the piping between the <br />domestic meter and the RPBA has to be limited to 70' maximum (with no connections). This will require the <br />relocation of the domestic water meter per Std Dwg 503B to the south (closer to gridline E and F). This domestic <br />water meter and the associated water line is shown on sheet C2.0. <br />RESPONSE: <br />Per city approval - Moving the valves and equipment as noted above is approved. <br />APPROVED BY CITY OF EVERETT PUBLIC WORKS <br />By SFandler at 1:21:51 PM, 12/11/2015 <br />