Laserfiche WebLink
STORMWATER SITE PLAN <br />EVERETT COMMUNITY COLLEGE HOUSING - BROADWAY <br />SEPTEMBER 11, 2015 <br />PAGE 6 <br />Demolition: <br />• Dust released from demolished sidewalks shall be controlled using dust control <br />measures (BMP C140). <br />• Storm drain inlets vulnerable to stormwater discharge carrying dust, soil, or debris will <br />be protected using storm drain inlet protection (BMP C220 as indicated on the plan). <br />• Process water and slurry resulting from sawcutting and surfacing operations will be <br />prevented from entering the waters of the state by implementing sawcutting and <br />surfacing pollution prevention measures (BMP C152). <br />1. Slurry and cutting shall be vacuumed during cutting and surfacing operations. <br />2. Slurry and cuttings shall not drain to any natural or constructed drainage <br />conveyance. <br />3. Collected slurry and cuttings shall be disposed of in a manner that does not <br />violate groundwater or surface water quality standards. <br />Concrete and grout: <br />• Process water and slurry resulting from concrete work will be prevented from entering <br />the waters of the state by implementing concrete handling measures (BMP C151). <br />1. Concrete truck chutes, pumps, and internals shall be washed out only into <br />formed areas awaiting installation of concrete or asphalt. <br />2. Unused concrete remaining in the truck and pump shall be returned to the <br />originating batch plant for recycling. <br />3. Hand tools including, but not limited to, screeds, shovels, rakes, floats, and <br />trowels shall be washed off only into formed areas awaiting installation of <br />concrete or asphalt. <br />When no formed areas are available, washwater and leftover product shall be contained in a <br />lined container. Contained concrete shall be disposed of in a manner that does not violate <br />groundwater or surface water quality standards. <br />Sanitary wastewater: <br />• Portable sanitation facilities will be firmly secured, regularly maintained, <br />and emptied when necessary. <br />• Solid waste will be stored in secure, clearly marked containers. <br />Other: <br />Other BMPs will be administered as necessary to address any additional <br />pollutant sources on site. <br />Element #10: Control De-Watering <br />Borings were extended to 8 feet with no indication of groundwater. No dewatering is expected <br />as no excavation to the water table is anticipated. Any dewatering will be directed to an on-site <br />sump or pre-manufactured settling system to allow for settlement of suspended solids. <br />P: \1'i�tk Pri�jcil�'?UI� 1i-17U I<t�i- l3m;ul��.n`('L I)O('S Kui Rnr,i�l��':i1' Ih;iin.if�c li-1'ID.d�u <br />