Laserfiche WebLink
Geotechnical Report - _ __ . _sed <br />Proposed Apartments: 1002, 1006, and 1008 Broadway Street, Everett, Washington <br />May 12, 2015 <br />Point loads located close to the top of the wall, such as outriggers of heavy cranes, may <br />apply additional loads to the lagging. These loads, if applicable inay need to be <br />individually analyzed. <br />We recommend voids behind the lagging be backfilled with CDF. <br />5.4 ECOLOGY BLOCK SHORING <br />Ecology blocks consist of concrete blocics with a typical din�ension of 2 feet high, 2 feet <br />deep and 6 feet long. Based on the encotmtered soil conditions, in our opinion, ecology <br />blocks can be used to shore the lower partion of the west excavation with a maximum <br />height of three blocks, or 6 feet, with a 6V:1H (Vertical:Horizontal) batter. The blocks <br />should be placed in a running bond pattern and the space between the blocks and <br />excavation backfilled with clean crushed rock meeting the requirements for Permeable <br />Ballast in the WSDOT Standard Specifications, Section 9-039(2) (WSDOT, 2014), or an <br />approved equivalent. Clean rounded gravel such as pea gravel or washed gravel/drain <br />rock should not be used to backfill the block wall. <br />The base course of blocks should be embedded at least one foot below the construction <br />subgrade elevation. The grade above the wall may be sloped at a 1 H:1 V inclination. <br />The ecology block shoring may be placed in alignment with the walls of the building and <br />can be used as the backform for the permanent basement walls. <br />The joints between the blocks will allow groundwater to seep through the shoring. As the <br />wall will be faced by the concrete basement walls, it will be necessary to provide <br />drainage to collect the seepage and prevent hydrostatic pressures from building up behind <br />the wall and concrete facing. For this application, a geotextile sheet drain incorporatin� a <br />filter fabric such as Miradrain 6000, or equivalent, should be used. The sheet drain <br />should connect to piping extending through the basement wall that connect to a collector <br />pipe on the inside edge of the perimeter foundation. <br />We recommend the ecology blocks be stockpiled on site before commencing with the <br />excavation. This will allow for placing the blocks as the excavation progresses. PanGEO <br />personnel should also be on site to observe the stability of the excavation and to monitor <br />the ecology block wall construction. <br />IS-048 100313roadway, Reviscd Pa�Te IZ PclnriEO., Inc. <br />