Laserfiche WebLink
PUBLIC '` _ORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />( Date: 4/25/2014 <br />Public Works Permit #: PW1404-035 <br />Buildinq Permit #; <br />Planning Reference #: <br />Public Works Fee $: $ 25.00 <br />Other $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />NGUYEN BRIAN M <br />3007 21 ST ST <br />EVERETT Wq 98201 <br />PHONE: 4253503424 PHONE: <br />TAX PARCEL ID # 00439154803200 SITE ADDRESS: 2402 BROADWAY <br />DESCRIPTION OF PROPOSED WORK: <br />CONSTRUCT 6' FENCE IN ROW <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 � <br />4. Per plan. <br />5. The fence is limited to a maximum height of 6 feet. Any changes to the location as shown on the site plan <br />requires review by the Pianning Department. �' <br />i:° ,� �::. -:::; <br />Your Public Works Inspector is Randy Allen. Call 425-339-7403 for any questions and/or inspection„s�, � <br />��C�/z�� � 2��' <br />Approved for Construction Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />;,'- � <br />-';= E"� <br />�:, � <br />_::i `- O <br />�_�. .. � <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the C� y and to replace <br />public property damaged thereby. <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION�� <br />. <br />��- � ���� � <br />�-�-� I ; <br />C J <br />