Laserfiche WebLink
C� ►* � ��1�I ��':,�1�1 <br />� r�� <br />� �r �:, �, �. <br />� <br />���. <br />THE <br />CONSULTANT <br />DAILY <br />INTO THE <br />PHOTOGRAPHS <br />BLDG 45-08; <br />COATINGS INSPECTOR DAILY REPORT DATE: Tuesday, May 22, 2012 OBS�RVATION NO: 002 <br />CUSTOMER: Boeing INSPECTOR: Tom Mathews CONTRACT ALS-2012013.00 <br />LOCATION: Everett, WA TIME ARRIVED: 07:00 TIME LEFT: 11:30 OWNER: Boeing <br />CONTRACTOR: IMCO General Construction. FOREMAN John Reda CREWMEN: 2 <br />SUBCONTRACTOR: Long Painting Supervisor <br />CONTRACTOR TIME ARRIVED: 07:00 TIME LEFT: 08:30 <br />WEATHER CONDITIONS: WIND: 5 MPH FROM: <br />Work performed in interior of bldg., which will be <br />environmentally controlled to meet specification parameters. <br />Exterior areas will be contained and environmentally <br />controlled prior to coating application. <br />❑ SUN � CLDY � �IN � CLEAR <br />OVER NIGHT: LOW TEMP: 52°F HUMIDITY: 60 Average <br />DAYTIME: HIGH TEMP: 59°F <br />TIME PAINTING: START: NA FINISH: NA <br />Sean Crai <br />Bldg. TINi� DRY W�T R�L. DCW ST��L +�_ SAT <br />45-08 BtiLB BULB HUM. POINT <br />(°F (°I' (%) (°P' ) <br />Interior <br />Exterior 07:30 58 n/a 57 43 59 +15.7 X <br />Interior <br />Exterior n/a <br />Interior <br />INSPECTION REPORT IS PROVIDED TO THE E.I.C. VIA EMAIL FOR POSTING <br />CLIENTS SYSTEM. THE ORIGINAL FORMAT AND THE ORININAL <br />ARE AVAILABLE WITH THE PROJECT DOCUMENTS. <br />DESCRIPTION OF WORK AND/OR AREAS: <br />QUALITY OF WORK DONE AND BEING DONE (CLEANLINESS, DEGR�E OF SURFACE PREPARATIO?�r. APPLICATION QUALITY & COATING THICKNESS): NA. <br />WORK NOT IN COMPLIANCE WITH PROJECT SPECIFICATIONS: Any work deemed or constituting an NCR will be listed and reported in conuilents <br />section of report. <br />DESCRIPTION OF WORK AND/OR AREAS: Long Painting administered Moisture Meter Test ASTM F-1869 . <br />QUALITY OF WORK DONE AND BEING DONE (CLEANLINESS, DEGREE OF SURFACE PDREPARATION. APPLICATION OUALITY & COATING THICKNrSSI: The worlc and <br />production schedule is satisfactory with the eaceptions aud/or if any listed in comments. <br />WORK NOT IN COIVIPLIANCE WITH PROJECT SPECIFICATIONS: Any work deemed or constituting an NCR will be listed and reported in comments <br />section of report. <br />Page 1 of 5 <br />