COATINGS INSPECTOR DAILY REPORT DATE: Wednesday, May 23, 2012 <br />OBSERVATION NO: 003 <br />CUSTOMER: Boeing INSPECTOR: Tom Mathews CONTRACT ALB-2012013.00 <br />LOCATION: Everett, WA TIME ARRIVED: 08:00 TIME LEFT: 12:00 OWNER: Boeing <br />CONTRACTOR: IMCO General Consri-uction. FOREMAN John Reda CREWMEN: 2 <br />SUBCONTRACTOR: Long Paniting Supervisor Sean Crai <br />CONTRACTOR TIME ARRIVED: 00:00 TIME LEFT: 00:00 Bldg. TI1I� DR1� w�T R�L. D�W ST�EL +�_ <br />/�� c��� � 45-08 BULB BULB HUM. POINT <br />���1��� WEATHER CONDITIONS: WIND: 8 MPH FROM:NE (°�) <br />�����°3� <br />�l.f�ll�o <br />THE <br />CONSULTANT <br />DAILY <br />INTO THE <br />PHOTOGRAPHS <br />Work performed in exterior of bldg., which will be <br />environmentally controlled to meet speciiication parameters. <br />Exterior areas will be contained and environmentally <br />controlled prior to coating application. <br />❑ SUN � CLDY � �IN � CLEAR <br />OVER NIGHT: LOW TEiVIP: 49°F HUMIDITY: 82 Average <br />DAYTIME: HIGH TEMP: 58°F <br />TIME PAINTING: START: NA FINISH: NA <br />Interior <br />Exterio r <br />Interior <br />Exterior <br />Interior <br />SAT <br />08:36 � 67.7 � n/a � 50.7 � 48.8 � 66.0 �+17.2 � X <br />n/a <br />INSPECTION REPORT IS PROVIDED TO THE E.I.C. VIA EMAIL FOR POSTING <br />CLIENTS SYSTEM. THE ORIGINAL FORMAT AND THE ORININAL <br />ARE AVAILABLE WITH THE PROJECT DOCUMENTS. <br />DESCRIPTION OF WORK AND/OR AREAS: <br />BLDG 45-08; Moisture Meter Test (Calcium Chloride Test) ASTMD F-1869 Standard in progress <br />QUALITY OF WORI� DONE AND BEING DONE (CL�ANLINESS DEGR�E OF SURFACE PREPAItATION APPLICATION QUALITY & COATING THICKNESS): NA. <br />WORK NOT IN COMPLIANCE WITH PROJECT SPECIFICATIONS: Any work deemed or constituting an NCR will be listed and reported in comments <br />section of report. <br />DESCRIPTION OF WORK AND/OR AREAS: Long Painting administered Moisture Meter Test ASTM F-1869 . <br />QUALITY OF WORK DONE AND BEING DONE (CL�ANL[NESS DEGREE OF SURPACE PDREPARATtON APPLICATION QUALITY & COATING THICKNESS): TI70 WOYIC 3riCI <br />production schedule is satisfactoiy with the exceptions and/or if any listed in comments. <br />WORK NOT IN COMPLIANCE WITH PROJECT SPECIFICATIONS: Any work deemed or constituting an NCR will be listed and reported in comments <br />section of report. <br />Page 1 of 6 <br />