Laserfiche WebLink
f' � � � i•i 4� `vw � <br />1 <br />������ ❑ <br />COATINGS INSPECTOR DAILY I2EPORT DATE: Friday, May 25, 2012 OBSERVATION NO: 03 <br />CUSTOMER: Soeing INSP�CTOR: Tom Mathews CONTRACT ALB-2012013.00 <br />LOCATION: Everett, WA TIME ARRIVED: 06:45 TIME LEFT: 11:00 OWNER: Boenlg <br />CONTRACTOR: IMCO General Constniction. FOREMAN Sean Graig CREWMEN: 2 <br />SUBCONTRACTOR: Long Painting <br />CONTRACTOR TIME AR1tIVED: 06:00 TIME LEFT: ll:30 <br />WEATHER CONDITIONS: WIND: 6 MPH FROM: NE <br />Exterior areas will be contained and environmentally <br />controlled prior to caating applicaiion. <br />� SUN ❑ CLDY ❑ 12AIN � CLEAR <br />THE OVER NIGIIT: LOW T�MP: 48°F HUMIDITY: 73 Average <br />CONSULTANT DAYTIME: HIGH TEMP: 69°F <br />DAILY <br />INTO THE TIME PAINTING: START: NA FINISH: NA <br />PHOTOGRAPHS <br />DESCRIPTION OF WORK A1VD/OR AREAS: <br />Bldg. TIbi� DRY WET R�L. D�W STEGL �..�_ SAT <br />45-08 BULB BULB IIUM. POINT <br />��F ��r (°ro> ��r <br />Interior <br />Exterior 07:23 61.4 n/a 59.1 47 56.3 +9.3 X <br />Interior <br />Interior <br />Interior <br />INSPECTION REPORT IS PROVIDED TO THE E.I.C. VIA EMAIL FOR POSTING <br />CLIENTS SYSTEM. THE ORIGINAL FORMAT AND THE ORININAL <br />ARE AVAILABLE WITH THE PROJECT DOCUMENTS. <br />BLDG 45-OS; Pulled Moisture Meter Test. Putting up containment around area to be coated. <br />QUALITY OF WORK DONE AND BEING DONE (CLEANLINESS. DEGREE OF SURFACE PREPARATION APPLICATION OUALITY & COATING THICKNESS�: NA. <br />WORK NOT IN COMPLIANCE WITH PROJECT SPECII'ICATIONS: Any worlc deemed or constituting an NCR wi11 be listed and reported in comments <br />section of report. <br />DESCRIPTION OF WORK ANI)/OR ARE�S: DFT's on interior bifurcation. Second coat on exterior embeds. Carbozinc primer on exterior bifurcation. <br />QUALITY OF WORK DONE AND BEING DONE (CLEANLINESS. D�GREE OF SURI'ACE PDREPARATION. APPLICATION OUALITY & COATING THICKNESS): Th0 WOPIC arid <br />production schedule is satisfactoiy with the exceptions and/or if any listed in comments. <br />WORK NOT IN COMPLIANCE WITH PROJECT SPECIFICATIONS: Any worlc deemed or constituting an NCR will be listed and reported in comments <br />section of report. <br />Page 1 of 5 <br />