My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1321 COLBY AVE 8TH FLOOR 2021-01-25
>
Address Records
>
COLBY AVE
>
1321
>
8TH FLOOR
>
1321 COLBY AVE 8TH FLOOR 2021-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 2:17:50 PM
Creation date
12/1/2016 1:21:20 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1321
Tenant Name
8TH FLOOR
Notes
HOSPICE CARE CENTER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Providence I�ospice and Home Ca�c �� Snoho�nish Co <br />Chapter 246-335 WAC Hospice Care <br />New 16 Red H�s��ice 'en er <br />Project Status: <br />- Authorized to Begin Construction — <br />Comments are NOT Approved <br />This project is not approved fot• use or licensure. The construction documents have been reviewed and construction <br />can begin, si�bject lo conslruction pe�mitting fi�om the local birilding o�cial. This project will not be approved until <br />tlie comments labcled as "not approved" have been resolved by providing a written response to each of tlle <br />comments. When referencii�g drawings o�• attached materials, provide sl�eet or page #, revision # and date as <br />applicable. Additional comme»ts may follow based on desig�� team response and site inspections may be req�iired to <br />verify compliance. <br />Plc�isc notc thc f��ll��wing: <br />■ Tl�e stamped "Authorization to Begin Construction" drawings will be delivered to the Facility Administrator. <br />These shall be kept available on site for inspection dL�ring construction and post occupancy survey. <br />■ Any changes/deviations (incl. change orders or addenda) froin the approved documents must be submitted to <br />the Department for review and approval. <br />■ Beginning construction prior to resolving the attached comments will constitute facility acknowledgement that <br />you are proceeding at your own risk. <br />■ Please include your CRS n�unber on all commlinications to Construction Review Services. <br />PROJECT CLOSF-OUT REQUIREMENTS You must notify the departillent when <br />construction is complete by completing the following steps: <br />✓ Verify tliat you have resolved all of the com�nents on tlzis form and have submitted any <br />revisions <br />✓ Coinplete tlle Onliile Notification of Construction Completed at: <br />http://www.doh.wa.gov/NotificationofCoinpletion.aspY <br />✓ F,mail or fax a copy of the approval from the local b�iilding department (final pennit <br />approval or certificate of occupancy); and <br />✓ Email or faX a floor plan showing tl�e scope of work. <br />✓ Einail: fslcrs�doh.wa.gov Fax: 360-236-2321, Attn: Construction Review <br />Once your construction project is complete, you may contact the DOH Office of Customer Service for help <br />with adjusting or amending your license to add this project. Their telephone number is 360-236-4700. <br />You can monitor project status at �v�ti���.duh.��va.�ov/crs. <br />Page 3 of 10 Plan Review Comments for Project # 60542870 <br />
The URL can be used to link to this page
Your browser does not support the video tag.