Laserfiche WebLink
� <br />Providencc Hospicc and }lome C'ziit v'f Snohomish Co <br />Chapter- 246-335 WAC Hospice Care <br />Ne��v 16 13cd Ilospice Ccnier <br />8 ❑X Provide a certification repol-t of the Med-bas system afier the ���or1c is couzplete. <br />WAC 246-�35-250 and Nl PA 99: 4-�.4.1.3 <br />9 ❑X Notify the CRS ��lan reviewer for the I-ol1�����in� on sit�c inspections. <br />1) Prior to the placement of the gypsum wall board. <br />2) Prior to placeinent of all the ceiling tiles so that fire and snloke barriers maybc <br />seen for continuity. <br />3) One week prior to final inspection by the local building ofilic�ial. <br />Provide a 1 week lead time to cool-diilate scl�edules. <br />WAC 246-335-195 and IBC ] 10 <br />Site Visit Septembcr 22, 2015 <br />10 N Nole: <br />Ensure that tl�e snlolce barrier walf runs to the outside wall. <br />IBC 709.4 <br />11 N Note: <br />The smoke danlpe��s are installcd properly. <br />IBC 717.5.5 <br />12 N Note: <br />l�he O2 zone valve was movcd so thai it was not behind the duor. <br />CuniJ�liaiice irilh llie rontnA��itt,�� abol�c� p��oriciccl bi- Ihe Uepcu•Inu:nt of l/eulth. Cu�i.��lrzrctiu�i Rcvre�v Servrres, n�•c neec.��.sui.t-Jor llirs fc�cilitv /o ���ec�! <br />the reqttirements of the app(acuble licensing regulntions foz�nd iiz the WashingXon State Administrative Code mzd assocraled referei�ces. Thea�c� <br />con�ments do f�ot relieve the fncrlrly fi•om the responsrbrlity to meet �he reyz�irements of any other applicnble fer/��i�u/, s��u��� o�� lorul �•<���irinti��rr.,�. <br />Ir� /Iae erc�nt of con/7rcLs� hehrecn alhc�r jni�i.�drelinns �iricllhesc ii�riltc�r con�ments, the r�io.r/ .strin�enl shrrll a��/�li�. <br />Page 10 of 10 <br />b <br />Plan Review Comments for Project # 60542870 ;� ;��� <br />