My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1321 COLBY AVE 8TH FLOOR 2021-01-25
>
Address Records
>
COLBY AVE
>
1321
>
8TH FLOOR
>
1321 COLBY AVE 8TH FLOOR 2021-01-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2021 2:17:50 PM
Creation date
12/1/2016 1:21:20 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
1321
Tenant Name
8TH FLOOR
Notes
HOSPICE CARE CENTER
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Providence Hospice and Ho�ne Care of Snohomish Co <br />Chapter 246-335 WAC ITospice Care <br />New 16 F3ed Hos��icc ��� tcr <br />PI•oject �tatusa <br />- Authorized to Begin Constr°ucti�n — <br />Comments are Approved <br />This project is not approved for use or lice��sure. The construction doc�iments have bccn rcvic��ved and construction <br />can begii�, s�.rbject !o cor�strzrction pef•��zitling fi�ona the local bi�ilding official. <br />Additional commci�ts may follow based on design team response and site i�lspections inay be required to veri�ly <br />compliance. <br />Please note tl�e following: <br />■ The stamped "A�ithorization to Begin Construction" drawings will be delivered to the F'acility Administrator. <br />These shall be kept available on site for inspection during construction and post occupancy stu-vey. <br />■ Any changes/deviations (incl. change orders or addenda) fi�om the appi-oved documen�s must be subiY�itted to <br />the Department for revic��� and approv��l. <br />■ Beginning construction prior to resolvinQ the attached comments �vill constitute facilit�� ackno�vled�7en�ent that <br />you are proceeding at your own risl<. <br />■ Please include votu� CRS number ��n all con�munications to Construction Revic�v Scrvices. <br />]'ROJ�CT CLOSE-OUT REQUlRTMENTS You inust i�otiiy the deparhncnt when <br />construction is complete by completing the following steps: <br />✓ Verify that you have resolved all of the comments on this form and have submitted any <br />1'CVlS10l1S <br />✓ Complete the Online Notification of Construction Completed at: <br />http://www.doh.wa.gov/NotiticationofCompletion.aspx <br />✓ Email or fax a copy of the approval fro�n the local building department (final permit <br />approval or certiticate of occupancy); ancl <br />✓ Email or fax a f7oor plan showing the scope of work. <br />✓ Email: fslcis(c�doh.wa.Q-,_,ov Fax: 360-236-2321, Attn: Construction Review <br />Once your construction project is complete, you may contact the DOH Of'fice of Cust�omer Servicc for help <br />with adjusting or amending yotilr license to acld this project. Their tcle��ho»c nun��ber is �60-2 �C-�700. <br />You can mo��itor project status at w�v�v.doh.�va.<�ov/cr�;. <br />Page 3 oi� 1 1 Plan Review Comments Cor Project # 60542870 ��� <br />;� <br />
The URL can be used to link to this page
Your browser does not support the video tag.