My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
825 N BROADWAY 2017-01-13
>
Address Records
>
N BROADWAY
>
825
>
825 N BROADWAY 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 6:02:11 PM
Creation date
12/2/2016 1:35:07 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
825
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2 Runoff Conveyance and Treatment BMPs <br />BMP C200: Interceptor Dike and Swale <br />Purpose Provide a ridge of compacted soil, or a ridge with an upslope swale, at the <br />top or base of a disturbed slope or along the perimeter of a disturbed <br />construction area to convey stormwater. Use the dike and/or swale to <br />intercept the runoff from unprotected areas and direct it to areas where <br />erosion can be controlled. This can prevent storm runoff from entering the <br />work area or sediment-laden runoff from leaving the construction site. <br />Conditions of Use <br />Design and <br />Installation <br />Specifications <br />Where the runoff from an exposed site or disturbed slope must be conveyed <br />to an erosion control facility which can safely convey the stormwater. <br />• Locate upslope of a construction site to prevent runoff from entering <br />disturbed area. <br />• When placed horizontally across a disturbed slope, it reduces the <br />amount and velocity of runoff flowing down the slope. <br />• Locate downslope to collect runoff from a disturbed area and direct it <br />to a sediment basin. <br />• Dike and/or swale and channel must be stabilized with temporary or <br />permanent vegetation or other channel protection during construction. <br />s Channel requires a positive grade for drainage; steeper grades requit-e <br />channel protection and check dams. <br />• Review construction for areas where overtopping may occur. <br />• Can be used at top of new fill before vegetation is established. <br />• May be used as a permanent diversion channel to carry the runoff. <br />• Sub-basin tributary area should be one acre or less. <br />• Design capacity for the peak flow from a 10-year, 24-hour storm, <br />assuming a Type 1 A rainfall distribution, for temporary facilities. <br />Alternatively, use 1.6 times the l 0-year, 1-hour flow indicated by an <br />approved continuous runoff model. For facilities that will also serve <br />on a permanent basis, consult the local government's drainage <br />requirements. <br />Interceptor dikes shall meet the following criteria: <br />Top Width 2 feet minimum. <br />Height 1.5 feet minimum on berm. <br />Side Slope 2:1 or flatter. <br />Grade Depends on topography, however, dike system minimum is <br />0.5%, maximum is 1 %. <br />Compaction Minimum of 90 percent ASTM D698 standard proctor. <br />February 2005 Volume 1l — Construction Stormwater Pollution Prevention 4-57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.