Laserfiche WebLink
Stormwater Pollution Prevention Plan <br />Stormwater Pollution Prevention Plan <br />Owner's Representative <br />Stacy Shewell <br />701 Dexter Avenue N <br />Seattle, WA 98109 <br />For <br />WSU NPSE <br />Prepared For <br />Northwest Regional Office <br />3190 - 160th Avenue SE <br />Bellevue, WA 98008-5452 <br />425-649-7000 <br />Developer <br />Washington State University <br />2000 Tower Street <br />Everett, WA 98201 <br />Operator/Contractor <br />Hoffman Construction <br />I505 Westlake Ave N #500 <br />Seattle, WA 98109 <br />Project Site Location <br />851 Norkh Broadway, Everett, WA 98201 <br />Certified Erosion and Sediment Control Lead <br />TBD <br />TBD <br />SWPPP Prepared By <br />KPFF Engineers <br />1601 Sth Avenue, Suite 1600 <br />Seattle, WA 98101 <br />(206) 622-5822 <br />Kimberly McNabb, Civil Design Engineer <br />SWPPP Preparation Date <br />July 10, 2015 <br />Approximate Project Construction Dates <br />July 2015 <br />May 2017 <br />8 <br />