My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
825 N BROADWAY 2017-01-13
>
Address Records
>
N BROADWAY
>
825
>
825 N BROADWAY 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 6:02:11 PM
Creation date
12/2/2016 1:35:07 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
825
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Pollution Prevention Plan <br />0 <br />2-year stormwater iunoff peak flow during construction: 0.71 cfs <br />10-year stormwater runoff peak flow during construction: 1.07 cfs <br />2-year stormwater runoff peak flow after construction: 0.61 cfs <br />10-year stormwater runoff peak flow after construction: 0.96 cfs <br />The following summarizes details regarding site areas for the Big J project site: <br />Total site area: .69 acres <br />Percent impervious area before construction: 19 % <br />Percent impervious area after construction: 59 % <br />Disturbed area during construction: 0.69 acres <br />Disturbed area that is characterized as impervious (i.e., <br />access roads, staging, parking): 0.42 acres <br />2-year stormwater runoff peak flow during construction: 0.21 cfs <br />l 0-year stoimwater runoff peak flow during construction: 0.29 cfs <br />The following summarizes details regarding site areas for the Index Project Site: <br />Total site area: 0.81 acres <br />Percent impervious area before construction: 93 % <br />Percent impervious area after construction: 88 % <br />Disturbed area during construction: 0.81 acres <br />Disturbed area that is characterized as impervious (i.e., <br />access roads, staging, parking): 0.74 acres <br />2-year stormwater runoff peak flow during construction: 0.24 cfs <br />10-year stormwater runoff peak flow during construction: 0.33 cfs <br />All stormwater flow calculations are provided in Appendix F. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.