Stormwater Pollution Prevention Plan <br />• Construction Stormwater Filtration (BMP C251) <br />Construction Stormwater Chemical Treatment (BMP C 250) (implemented only <br />with prior written approval from Ecology). <br />3.1.5 Element #5 — Stabilize Soils <br />Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent <br />erosion throughout the life of the project. The specific BMPs for soil stabilization that shall be <br />used on this project include: <br />• Plastic Covering (BMP C 123) <br />• Temporary Seeding (BMP C120) <br />The topography of the site is relatively flat and will not trigger high amounts of erosion. <br />Stabilization BMPs such as temporary seeding and/or plastic covering shall be <br />implemented, as necessary, to prevent erosion on exposed soils. <br />Alternate soil stabilization BMPs are included in Appendix C as a quick reference tool for the <br />onsite inspector in the event the BMP(s) listed above are deemed ineffective or inappropriate <br />dul-ing construction to satisfy the requirements set forth in the General NPDES Permit (Appendix <br />D). To a�oid potential erosion and sediment control issues that may cause a violation(s) of the <br />NPDES Construction Stormwater permit (as provided in Appendix D), the Certified Erosion and <br />Sediment Control Lead will promptly initiate the implementation of one or mot•e of the <br />alternative BMPs listed in Appendix C after the first sign that existing BMPs are ineffective or <br />failing. <br />The project site is located west of the Cascade Mountain Crest. As such, no soils shall remain <br />exposed and unworked for more than 7 days during the dry season (May 1 to September 30) and <br />2 days during the wet season (October 1 to April 30). Regardless of the time of year, all soils <br />shall be stabilized at the end of the shift before a holiday or weekend if needed based on weather <br />forecasts. <br />In general, cut and fill slopes will be stabilized as soon as possible and soil stockpiles will be <br />temporarily covered with plastic sheeting. All stockpiled soils shall be stabilized from erosion, <br />protected with sediment trapping measures, and where possible, be located away from storm <br />drain inlets, waterways, and drainage channels. <br />3.1.6 Element #6 — Protect Slopes <br />All cut and fill slopes will be designed, constructed, and protected in a manner that minimizes <br />crosion. The following specific BMPs will be used to protect slopes for this project: <br />l2 <br />