My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
825 N BROADWAY 2017-01-13
>
Address Records
>
N BROADWAY
>
825
>
825 N BROADWAY 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 6:02:11 PM
Creation date
12/2/2016 1:35:07 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
825
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Maintenance <br />Standards <br />• Whenever possible, the entrance shall be constructed on a ium, <br />compacted subgrade. This can substantially increase the effectiveness <br />of the pad and reduce the need for maintenance. <br />• Quarry spalls (or hog fuel) shall be added if the pad is no longer in <br />accordance with the specifications. <br />• If the entrance is not preventing sediment from being tracked onto <br />pavement, then alternative measures to keep the streets free of <br />sediment shall be used. This may include street sweeping, an increase <br />in the dimensions of the entrance, or the installation of a wheel wash. <br />• Any sediment that is tracked onto pavement shall be removed by <br />shoveling or street sweeping. The sediment collected by sweeping <br />shall be removed or stabilized on site. The pavement shall not be <br />cleaned by washing down the street, except when sweeping is <br />ineffective and there is a threat to public safery. If it is necessary to <br />wash the streets, the construction of a small sump shall be considered. <br />The sediment would then be washed into the sump where it can be <br />controlled. <br />• Any quarry spalls that are loosened from the pad, which end up on the <br />roadway shall be removed immediately. <br />• If vehicles are entering or exiting the site at points other than the <br />construction entrance(s), fencing (see BMPs C 103 and C 104) shall be <br />installed to control traffic. <br />• Upon project completion and site stabilization, all construction <br />accesses intended as permanent access for maintenance shall be <br />t�ermanentiv stabilized. <br />�oad <br />Ey�stm9 <br />� <br />i� / / <br />Install driveway culvert <br />if there is a roadside <br />ditch present <br />4"-8" quarry spalls <br />Geotextile - <br />�2" min. thickness <br />D�iveway shall meet the <br />requirements of the <br />permi�ting agency <br />Ii is recommended that <br />the entrance be <br />Crowned so thal runoff <br />d�ains off the pad <br />�i <br />�"��� ���' <br />15 (� <br />/\'J <br />Provide full width of <br />ingress/egress area <br />Figure 4.2 — Stabilized Construction Entrance <br />February 2005 Volume ll — Construction Stormwater Pollution Prevention 4-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.