Laserfiche WebLink
HVAC Equipment Schedule <br />COOLI NG H EATI N G E LECTRICAL <br />Total Heating Leaving EMernal <br />EQUIP MIN Cooling Sensible ARI Heating Power Air Static Fan Motor Sound <br />ID Brend Model Tons CfM OSA Capacity Capacity SEER Capacity Input Temp Pressure Power HP Voltage PH MCA MOCP Data Weight Notes <br />HP-12 Carrier SOVT-B30 2.5 1000 330 28 21 14.2 29 MBH 2.74 KW 112 0.5 0.32 0.5 208/230 1 62 70 75 db 3461bs 1,2,3,5 <br />NOTES: <br />1 Install With Factory Economizer <br />z Install On Factory Curb Adapter <br />3 Install With Single Point Entry Kit <br />4 Install With Motorized Dampers On Outside Air, Return And Releif Openings <br />5 New Unit Tonnage And Type To 8e Same As Unit Being Replaced <br />6 Install With Duct Smoke Detector <br />SCOPE OF WORK: <br />REPLACE (1) ROOFTOP MOUNTED 2.5 TONHVAC UNIT. <br />REPLACEMENT UNIT IS LIKE FOR LIKE. <br />Packaged Unit With Curb Adapter Attachment Detail <br />�3 S�Vp. <br />RNymp�c{ RTU'NMaplerp11r1�.menlDela�11114;�013J$ <br />HVAC GENERAL NOTES <br />THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET, WHICH MAY BE REQUIRED <br />�AC CONTRACTOR TO COORDINATE WITH ALL OTHER TRADES <br />ALL WORK SHALL CONFORM TO THE REQUIRMENTS OF WASHINGTON STATE CODES, REGULATIONS, ORDINANCES <br />ID THE AUTHORITY HAVING JURISDICTION INCLUOING BUT NOT LIMITED TO ANY OF THE FOLLOWING: <br />: 2012, IMC 2012, UPC 2012 AND THE WSEC 2012 <br />AIR ECONOMI2ERS SHALL BE PROVIDED ON ALL NEW SYSTEMS IF APPLICABLE. ECONOMIZERS SHALL COMPLY WITH SECTIONS <br />03.4.1.1 THROUGH C403.4.1.4 OF THE WSEC 2012 <br />FLEXIBLE DUCT IENGTHS SHALL NOT EXCEED 10' UNLE55 PRIOR APPROVAL HAVE BEEN GIVEN <br />PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH THE CURRENT IBC <br />PIPING AND DUCT PENETRATIONS THRU FLOORS AND WALLS SHALL BE SLEEVED AND/OR FIRE STOPPED <br />� AS TO MAINTAIN THE INTEGRITY OF THE SURFACE <br />MAINTAIN 10' MINIMUM CLEARANCES TO ALL OUTSIDE AIR AND ECONOMIZER INTAKES FROM ANY EXHAUST VENTS <br />DUCTWORK TO MEET THE INSULATION REQUIRMENTS OF THE 2012 WSEC <br />AlL DUCTWORK CONSTRUCTED AND SEAIED PER 2012 WSEC <br />LOCATION MAP <br />�.r.�.�..; - :.¢ . �ai� <br />.�� ��. <br />SITE PLAN <br />t'Y'1G5�7-C�t6 <br />M� S e;,r;raci s�;v;;,�� �tic � <br />H <br />� <br />Q <br />W <br />o� <br />� <br />O <br />Z <br />� <br />Q <br />U <br />� <br />Q <br />_ <br />Q <br />J <br />0 <br />a <br />0 <br />� <br />O <br />Z <br />� <br />a <br />U <br />H <br />� <br />Q <br />W <br />� <br />0 <br />N <br />00 <br />0 <br />N <br />00 <br />� <br />a <br />� <br />� <br />� <br />W <br />� <br />w <br />w <br />F. R.O. <br />7-6-15 <br />JS <br />NORTH <br />M-1 <br />