Laserfiche WebLink
� � TT <br />JUNE 30, 2016 <br />�-.q m;., ,�y.. �,, ��, .� . -,q.. a, -.� <-. n7 , <br />�/� �a:�'j k � � iJ i`;�rf���'� � � � ��a� � �U T'� � � 1��I�F <br />r <br />3200 Cedar St, Everett, WA 98201 <br />Permit Services: (425)257-8810 <br />BALDWIN BROTHERS LLC <br />10075 N GOVERNMENT WAY <br />HAYDEN, ID 83835 <br />,.T. <br />, �c '." J <br />EXPIRED PERMIT NO. B1409-071 <br />SITE ADDRESS: 1007 SE EVERETT MALL <br />DESCRIPTION OF WORK: EXTERIOR BUILDING MODIFICATIONS-ARBY'S <br />EXPIRATION DATE: 10/14/2015 <br />Work under this expired permit is no longer authorized. <br />Sections 105.5 and R105.5 of the Internationai Building Code and International Residential Code <br />state that permits become invalid if the work is not commenced or is suspended or abandoned for <br />more than 180 days. If work has been completed, you may request final inspection within 14 days of <br />the mailing date of this letter. After that time the permit file will be sent to records storage. <br />To request inspection, call (425) 257-8881 OR schedule on-line at: <br />https://everettwa.gov/FormCenter/PublicWorks-5/Inspection-RequestPermit-Services-123 <br />before 4 p.m. for next day inspection. <br />If at some time in the future you decide to continue with this work you will need to apply for a new <br />permit. <br />If you would like to discuss the status of the permit, contact our Permit Technicians at (425) <br />257-8810. <br />Inspection Record: <br />2/20/15 Framing Approval Roof framing, see notes <br />Framing for roof parapet wall and sheeting (only), OK to roof - shingle. <br />Note: This is not interior framing approval. Need plans for new beams/post etc. before interior framing <br />can be inspected. <br />3/11/15 Framing PartialApproval See notes <br />Framing for 5&1/8" x 22&1/2 x 24 ft V4 glulam beam. <br />As per plans, OK to cover, beam/ceiling area only. <br />3/12/15 ShearNailing Approval OK to cover (sheeting) <br />4/17/15 Mark Final** PartialApproval <br />1) Interior work completed. <br />2) Recall when exterior is completed. <br />3) Call for Public Works final. <br />See notes <br />Page 1 of 1 <br />