My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6211 EVERGREEN WAY PEKING DUCK 2017-01-13
>
Address Records
>
EVERGREEN WAY
>
6211
>
PEKING DUCK
>
6211 EVERGREEN WAY PEKING DUCK 2017-01-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2017 6:32:33 PM
Creation date
12/5/2016 2:02:39 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6211
Tenant Name
PEKING DUCK
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�:..... <br />— <br />._V '...: � p..... <br />'_ f.:-... <br />LL`. � <br />`_S� <br />F�... <br />_; <br />i�:i <br />i;r' <br />'"� c_r� <br />C7J i1_I <br />a_:� CL_ <br />r., <br />, ;- , <br />• <br />E„- <br />afl/ ETT <br />(425) 257-8810 <br />�- ; s;�� :- <br />Lt7 fm <br />�,F.. <br />Plan Check No.: <br />Application Date: <br />Tenant: <br />Owner: <br />Job Address: <br />Proposed Use: <br />Description of Work: <br />M 1608-032 <br />8/11 /2016 <br />PEKING DUCK MANDARIN <br />TONG HING CORP <br />6211 EVERGREEN WAY <br />RESTAURANT <br />DUCTLESS HEAT PUMP <br />Plan Check Fee Paid: $75 <br />:'�'he building permit application for the above-referenced project is being conditionally accepted for filing <br />'�ending the determination of its completeness. <br />If the City review determines that any additional land use approval or any additional information is <br />required to complete your building permit application, it will be necessary to submit this additional <br />information or acquire the additional land use approval prior to your application being considered complete <br />for filing. If no other land use approval or additional information is required, your building permit <br />application will be considered filed as ofthis date. Plan review fees are estimates. Final plan review fees <br />will be calculated at permit issuance. <br />BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br />WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br />-� � � /� � �,� <br />S�gnature Da e <br />FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.