Laserfiche WebLink
� <br />�� compliance for ��-eather resist�►nt e�terior �vall envelope. <br />Inspections were perfot•med by Construction Consultants of Washington, <br />i.L�' C�r the I�iiu�vin�: <br />Areas of �liaterial rern�val at �� indo«�s <br />I;�sp�ction of nc�v �r�aterial applicatiu;� ai W1i1C�OWS <br />�reas of material removal at sliding �lass doors <br />Inspection of ne��- material application at slidin� �lass doors <br />A,reas �± :::at��r:al removal at Ea�alls 4 <br />Inspection of ne�� �'�'RB and sidin;= installation <br />Ai�eas of� �i�ater-ial reino��al at decks � <br />Tn�pect.ion of deck t� w��ll tlashzn<.� <br />�. <br />Ac•eas of repair or t-eplacement of matei-ials <br />Inspection of vai•ious at•eas foi� sealin� <br />A mock up was provided on site for ��-eather resistant barricr and tlashin�s. <br />Windo«-s and Slidinv Uoor flashin�: <br />Tne �vindc���• and siiuin;� u��r iia5nin� tnat ���as rem�veci anci re-insidlieci �� a5 <br />inspected to ass�u•e material is installed in a quality� tnanilel• and tc� meet <br />building code r•e��uirements. The flashing at the windo���s is with a meta( <br />iiiiSiiili� �"ii2C2 tilSta���C� ai ihe i30tiOlii Oi �"liiUi7�i'S iv ii2 iiiii) iiiC tti�aiil2P <br />resistant ban•ier. The slidina glass doors �t the patios ha��e a ne�v pan <br />installed at the thresholds. V <br />Areas of « indo�v and slidin` door flashin�s inspected ���ere abs�r��ed to be <br />completed with no outstandirl� cot-rection iterns. <br />Weather barrier: <br />The �veathei• resistant bai7-ier installed ���as iilspected to assui-e material is <br />installed to meet buildin� code requirements, manutact�u-er's specitication <br />and in a c�uality manner.�The �veather resistant barrier �vas F�rtitiber <br />Weathersma►-t Cori�i�lercial wrap. Some areas requireci ne�ti Ucns`lass Gold <br />material installed �4�hcre the bypstim sheathing ��as damaged. I-�ortitlash <br />tlashin` was installed at the insid� and outsicie cor-ners of the buildin�. <br />