My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2821 HEWITT AVE NW PLUS CREDIT UNION 2019-04-12
>
Address Records
>
HEWITT AVE
>
2821
>
NW PLUS CREDIT UNION
>
2821 HEWITT AVE NW PLUS CREDIT UNION 2019-04-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2019 7:05:07 AM
Creation date
12/6/2016 9:18:05 AM
Metadata
Fields
Template:
Address Document
Street Name
HEWITT AVE
Street Number
2821
Tenant Name
NW PLUS CREDIT UNION
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />E{i ETT <br />(425) 257-8810 <br />Plan Check No.: <br />Application Date: <br />Tenant: <br />Owner: <br />Job Address: <br />Proposed Use: <br />Description of Work: <br />Plan Check Fee Paid: <br />� <br />B1511-006 <br />11 /3/2015 <br />[TenName] <br />NORTHWEST PLUS CREDIT UNION <br />�8Z'�'HEWITT AVE <br />a"� � <br />COMMERCIAL <br />TI-NW PLUS CREDIT UNION <br />$1373.94 <br />The building pennit application for the above-referenced project is being conditionally accepted for filing <br />pending the determination ofi its completeness. <br />If the City review determines that any additional land use approval or any additional information is <br />required to complete your building pennit application, it will be necessary to submit this additional � <br />information or acquire the additional land use approval prior to your application being considered completc <br />for f�iling. If i�o other land use �pproval or additionai inibrmation is required, your buildin� permit <br />application will be considered tiled as of this date. Plan review fees are estimates. I�inal plan rcview (ees <br />will be calculated at permit issuance. <br />BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br />WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br />,:.::.::i <br />.: . �� I°�� C_•J <br />, V 1 � <br />Signature ate <br />FILE COPY <br />.J <br />� <br />� <br />; <br />; <br />' �; <br />
The URL can be used to link to this page
Your browser does not support the video tag.