Laserfiche WebLink
�� ` PUBLIC 1�.1RKS PERMIT <br />�;. <br />City of Everett Public Works Department <br />'; 3200 Cedar Street <br />� � <br />°-� Everett, WA 98201 <br />(425) 257-8810 <br />Date: 2/8/2010 <br />Public�rks Permit #: PW1002-006 <br />Buildinq Permit #; B1002-003 <br />Planninq Reference #: <br />Public Works Fee $: $ 25.00 <br />Other $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />ERICSON GLEN QUALITY GARAGE INC <br />ERICSON DEBORAH BOX 12094 <br />EVERETT Wq 98203-57 EVERETT Wq 98206 <br />25 PHONE: 4252597250 <br />PHONE: <br />TAX PARCEL ID # 00394000001700 SITE ADDRESS: 7410 HIGHLAND DR <br />DESCRIPTION OF PROPOSED WORK: <br />NEW DETACHED GARAGE <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 �-- <br />4. Connect rooftop downspouts to the drainage system provided for this lot. <br />5. Contact the Public Work Inspector (cali Cliff Lindman at 425-339-7407) prior to starting work to discuss site ;_;_; <br />: ...: <br />._,.. <br />issUe$ ; . ..__. , _., �_., <br />_-;� ;.__;� _ �_�.: ,_:_� � -' <br />�-- <br />�,-, -- __. <br />, <br />;.�: ,_ ,. <br />, . �.. , �. - <br />�:k <br />�mTi <br />�}� <br />�-.,. ���, - <br />G:r, � +tt r�r1 <br />r �•.. •kFr � <br />e `� 4m'� e <br />�.a iyq �, c;n ��:, <br />r7 L' I�;,:� r.�,� i,_"I <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public property damaged thereby. <br />Signature of Applicant <br />Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />