Laserfiche WebLink
Geotechnical Engineering Letter NGA File No. 900014 <br />Everett Water Pollution Control Facility July 30, 2014 <br />Everett, Washington Page 3 <br />CONCLUSIONS AND RECOMMENDATIONS <br />General <br />In our opinion, based on our understanding of the existing site conditions and the geotechnical report for <br />the area, it is also our opinion that the staircases could be supported pin piles to reduce the potential for <br />additional future settlement. The pin piles would transfer the staircase loads through the soft/loose fill <br />and alluvial soils down to the underlying competent native soils. <br />Pin Piles <br />We recommend that the staircases be supported on pin piles to transfer structure loads down into the <br />underlying competent materials. The structural engineer should design the new foundation supports and <br />determine the location of the supports based on the recommendations provided in this letter. The <br />preliminary pin pile layout and spacing are shown on the provided plans. <br />It is our opinion that 2-inch diameter pin piles are suitable for this project. The piles should be driven to <br />refusal using a hand operated 140-pound jackhammer. We recommend a design axial compression <br />capacity of two tons for each pile. The refusal criterion for this pile and hammer size is defined as less <br />than one inch of movement during 60 seconds of continuous driving. We recommend using galvanized <br />extra strong (Schedule 80) steel pipe. There should be contingencies in the budget and design for <br />additional/relocated piles to replace piles that may be obstructed by possible debris in the fill. <br />Final pile depths should be expected to vary somewhat and will depend on the nature of the underlying <br />soils. Depending on the actual makeup of the soil in the exact locations of the planned pin piles, we <br />anticipate pile depths to be significant (80 plus feet). The pin piles could refuse at shallower depths with <br />sand layers; however, for budgeting purposes the pin piles should be assumed to advance the full depth of <br />the alluvium deposit. It may be prudent to install a test pile at each staircases location to better define <br />anticipated pile depths: This should be verified in the field by the contractor under the supervision of <br />NGA. Due to the relatively small slenderness ratio of pin piles, maintaining pin pile confinement and <br />lateral support is essential to preventing pile buckling. <br />Friction on the bottom of pin pile supported foundations should be neglected for the purpose of <br />calculating lateral resistance; however, passive resistance on the below -grade portion of the foundation <br />could be utilized. The passive resistance could be calculated based on a triangular pressure distribution <br />NELSON GEOTECHNICAL ASSOCIATES, INC. <br />C5/_1S) <br />