My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9506 7TH AVE SE 2017-04-10
>
Address Records
>
7TH AVE SE
>
9506
>
9506 7TH AVE SE 2017-04-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2017 7:58:09 AM
Creation date
12/13/2016 3:49:38 PM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9506
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Meg Haley 131 �3 J?- u I S <br />From: Mans Thurfjell [mthurfjell@dci-engineers.comJ <br />Sent: Friday, October 11, 2013 12:43 PM <br />To: Meg Haley <br />Cc: 'Griffin Campbell'; 'stephenw@sabarch.com' <br />Subject: RE: Structural revisions <br />M eg, <br />We have no problem to write a final compliance letter, but will need the special inspection letter first on #he steel <br />column repairs. Griffin and I talked about this and I sent him a testing agency/contact to perform this job. <br />So we should be good! ��nd I will create a new "construction" set that covers al( the components needed. This will also <br />become a checic set far i:he inspector5. <br />Thanks, <br />Mans Thurfjeli, P.E. <br />Project Manager <br />'� <br />818 Skewart Street, Suite 1000 • Seattle, WA 98301 <br />P: 206.332.1900 � D: 206.787.8935 <br />mthurfiell(�dci-enqineers.com � www.dci-enQineers.com <br />Seattle � Spakane • Portland � San Diego • Austin • Irvine • Eugene • San Francisco <br />From: Meg Haley [mailto:MHaleyCa�everettwa.qov] <br />Sent: Friday, October 11, 2013 11:34 AM <br />To: Mans Thurfjell <br />Cc: 'Griffin Campbell'; 'stephenw@sabarch.com' <br />Subject: Structural revisions <br />Mans, <br />Our chief inspector has requested that a representative from your office participate in periodic site observations (which <br />they probably do anyway, I am guessing) so that at the end of the project, your office can write a letter to the Building <br />Department that the woric is mostly in compliance with the sketches, plans, and revisions that have been issued for <br />structurai changes. <br />With the decision to close a demolition permit, without city inspections, this would take care of making sure that the <br />engineering oversight includes any structural revisions required during the work. <br />Please let me I<now if you have any concerns, or if this is acceptable to you. <br />
The URL can be used to link to this page
Your browser does not support the video tag.