, <br />' <br />' <br />' <br />' <br />' <br />1 <br />' <br />' <br />' <br />� <br />1 <br />' <br />, <br />1 <br />' <br />' <br />' <br />Geotechnical Engi�leei-iilg Letter <br />Alllussaini Slope Stabilization and Retaining Walls <br />Everett, Washington <br />NGA File No. 867612 <br />December 10, 2012 <br />Page 8 <br />used to control erosion. Areas disturbed during construction should be protected from erosion. <br />Measures taken nzay include divertinQ surface water away fi-om the stripped areas. Silt feuces or <br />straw bales should be erected to prevent inuddy water from flowing over the site slopcs or into <br />the existing storm system. Disturbed areas should be replanted with ve�etation at the end of <br />construction as part of� an ap�roved erosioil control atid slope re-vegetation plan. "I'he vegetalion <br />should be maintaiiled until established. Final grading should inco�porate appropriate erosion <br />control measui-es to 1-outc stor�nwater runoi�f away fi-oiu the top of slopE aild to appropi-iate <br />ciiscliarge locations. <br />Runoff generated within the site, including roof downspouts, yard areas, and any other hard <br />surfaces should be i�ivestigated atld collected into catcl� basins and yard drains and tightliiled into <br />an approved stoi-mwater managenlent system. Under no cu-cumstances should runoff be allowed <br />to flow over the slope either during construction or on a permanent basis after construction has <br />been completed. <br />Vegetation on the slope should consist of decp-i-ooted, drought-resisting vegetation. All irrigation <br />systems on o�� near the slope should be avoided. Future yard waste, gass clippiilgs, or any othcr <br />waste material or household trasll sho�ild never be cast over the slope or piled tiear the walls. <br />Sucl� activity could lead to futw�e slope instability. Additionally, drainpipes associated with Che <br />ilew Keystone walls, sl�ould all be tightliiled to tlie bottrnn of the slope to an appi-oved stormwater <br />managen7ent system. <br />Site Preparation and Grading <br />After erosion control ineasures are inlplemented, site preparation should consist of removinb the <br />entire recently placed fill nzaterials and vegetation. Our explorations generally encountered <br />approximately 4.0 to 5.0 feet of silty fine to medium sand with gravel that we interpreted as the <br />i-ecently placed fill ulatei•ial. However, additioiial stripping may be required if ulore <br />�mdocumentecl tlll, loose soil, or organic materials are eilcountered in unexplored at•eas of the site. <br />The organio-rich materials should be removed from tl�e site. Sonie of tlle granular undocu�llented <br />fill soils could be re-used for wall backflll bchind tlle proposed walls depending on the moistui-e <br />co�ltent at the time oi� placement. We should be retained to evaluate proposed structw-al fill <br />NELSON GEOTECHNICAL ASSOCIATES, INC. <br />