My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1327 112TH ST SE BASE FILE 2017-10-23
>
Address Records
>
112TH ST SE
>
1327
>
BASE FILE
>
1327 112TH ST SE BASE FILE 2017-10-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2017 2:35:56 PM
Creation date
12/14/2016 1:40:50 PM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SE
Street Number
1327
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ProjectInfo ProjectAddress 13a� 112TH sm STE. A-2 Date 11/27/2013 <br />EVERETT, wr� For Building Department Use <br />Applicant Name: xenagni Ftilkeraon (co�eii neei�,> � �� ��`� 3� <br />Applicant Address: zaooz 64th AVE W STE. 2C Mountia�ce Terrace, w�+ <br />Applicant Phone: aas-e�o-5�oe x. iie <br />Project Description ❑ New Building ❑ Addition Q Alteration ❑ Plans Included <br />Lighting COmpllanCe Path � �ighting Power Density Calculations Q Total Building Performance <br />(If Total 8uilding Performance then only LGT-CHK is required.) <br />Interior Lighting � Buildinq Area Method Q Space-by-space Method <br />Compliance Option <br />Interior Lighting System 2x4 fluorescent fixture <br />Description 1 x4 fluorescent fixture <br />Briefly describe lighting <br />system type and features. <br />Additions and Change of Space Use (C101.4.3 & C101.4.4) <br />❑ Addition area or Change of Space Use area complies with all applicable provisions as stand alone project <br />� Addition area or Change of Space Use area is combined with existing building lighting systems to demonstrate <br />compliance with all applicable provisions <br />Provide Building Area Method (LTG-INT-BLD) or Space-By-Space Method (LTG-INT-SPACE) Compliance Form. Document maximum <br />allowed and proposed (including existing if applrcable) lighting wattage of Addition or Change of Use scope. Provide applicable lighting <br />controls per C405.2 and commissioning of lighting controls per C405.13. <br />Alterations, Renovations and Repairs (C101.4.3.1) <br />Q 60% or more of luminaires in space replaced <br />Provide Building Area Method (LTG-INT-BLD) or Space-By-Space Method (LTG-INT-SPACE) Compliance Form. Document maximum <br />allowed and proposed (including existing) lighting wattage of project scope <br />� Less than 60% of luminaires in space replaced <br />Provide Space-by-space Method (LTG-INT-SPACE) Compliance Form. Document existing total wattage in space and proposed <br />(including existing) lighting wattage of project scope <br />� Lamp and/or ballast replacement within existing luminaires only — existing total interior building wattage not increased <br />� New wiring installed to serve added fixtures and/or fixtures relocated to new circuit <br />Provide applicable manual lighting controls (C405.2.1), occupancy sensors (C405.2.2.2), daylight zone controls (C405.2.2.3), specific <br />application controls (C405.2.3), and commissioning of lighting conirols per C405.13 <br />� New or moved lighting panel <br />Provide all applicable lighting controls as noted for New Wiring, automatic time switch controls (C405.2.2.1), and commissioning of <br />lighting controls per C405.13. <br />� Space is reconfigured - luminaires unchanged or moved only <br />Provide all applicable lighting controls as noted for New Wiring and commissioning of lighting controls per C405.13. <br />� No changes are being made to the interior lighting and space use not changed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.