Laserfiche WebLink
2012 Washington State Ener ode Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 <br />, • • • <br />2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 20�3 <br />Project Info P�ojectAddress 30-10 WEZGHT Loss Fox Li� Date 2/21/2014 <br />i3z� ii2Ta sTx. For Building Department Use <br />SE, SUITE B <br />EVERETT <br />A licant Name: � I�I d 2— L'' � 7 <br />PP Sue Genty Interior Design, Inc. <br />Applicant Address: lz6io ne ioath st, Kirkland WA 98033 <br />Applicant Phone: a2s-s2�-sa3a <br />Project Description I❑ New Building ❑ Addition �Alteration ❑ Plans Included <br />Lighting Compliance (� Lighting Power Density Calculations � Total Building Performance <br />Path (If Total Building Performance then only LGT-CHK is required.) <br />Interior Lighting <br />�) Building Area Method � Space-by-space Method <br />Compliance Option <br />Interior Lighting System <br />Description <br />Briefly describe lighting <br />system type and features. <br />Additions and Change of Space Use (C101.4.3 & C101.4.4) <br />❑ Addition area or Change of Space Use area complies with ali applicable provisions as stand alone project <br />� Addition area or Change of Space Use area is combined with existing building lighting systems to demonstrate <br />compliance with all applicable provisions <br />Provide Building Area Method (LTG-INT-BLD) or Space-By-Space Method (LTG-INT-SPACE) Compliance Form. Document maximum <br />allowed and proposed (including existing if applicable) lighting wattage of Addition or Change of Use scope. Provide applicable lighting <br />controls per C405.2 and commissioning of lighting controls per C405.13. <br />Alterations, Renovations and Repairs (C101.4.3.1) <br />❑ 60% or more of luminaires in space replaced <br />Provide Building Area Method (LTG-INT-BLD) or Space-By-Space Method (LTG-INT-SPACE) Compliance Form. Document maximum <br />allowed and proposed (including existing) lighting wattage of project scope <br />� Less than 60% of luminaires in space replaced <br />Provide Space-by-space Method (LTG-INT-SPACE) Compliance Form. Document existing tota! wattage in space and proposed <br />(including existing) lighting wattage of project scope <br />� Lamp and/or ballast replacement within existing luminaires only - existing total interior building wattage not increased <br />� New wiring installed to serve added fixtures and/or fixtures relocated to new circuit <br />Provide applicable manual lighting controls (C405.2.1), occupancy sensors (C405.2.2.2), daylight zone controls (C405.2.2.3), specific <br />application controls (C405.2.3), and commissioning of lighting controls per C405.13 <br />� New or moved lighting panel <br />P�ovide all applicable lighting controls as noted for New Wiring, automatic time switch controls (C405.2.2.1), and commissioning of <br />lighting controls per C405.13. <br />� Space is reconfigured - luminaires unchanged or moved only <br />Provide all applicable lighting controls as noted for New Wiring and commissioning of lighting controls per C405.13. <br />� No changes are being made to the interior lighting and space use not changed. <br />