Laserfiche WebLink
2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 <br />• • • <br />2012 Washington State Energy Code Compliance Forms for Commercial, Group R1, and > 3 story R2 and R3 Revised June 20�3 <br />ProjectInfo ProjectAddress 132� llztn se sE Date 12/5/2013 <br />suite s For Building Department Use <br />Everett, WA <br />Applicant Name: xenaar�i Fiilkeraon (conneii Design GrouD) �� (? f 2 (-1Y,'� <br />� ) d V� <br />ApplicantAddress: azooz 66th Ave W 3te. 2C Mountlake Terrace, WA <br />ApplicantPhone: azs-e�o-e�oe X.iie <br />Project Description ❑ New Building ❑ Addition ❑ Alteration ❑ Plans Included <br />Llg�ltlrig CO1rip111riCC Pdt�l � Lighting Power Density Calculations Q Total Building Performance <br />(If Total Building Performance then only LGT-CHK is required.) <br />Interior Lighting <br />Compliance Option <br />Interior Lighting System <br />Description <br />Briefly describe lighting <br />system type and features. <br />QQ Buildinq Area Method <br />Q Space-by-space Method <br />Additions and Change of Space Use (C101.4.3 & C101.4.4) <br />❑ Addition area or Change of Space Use area complies with all applicable provisions as stand alone project <br />� Addition area or Change of Space Use area is combined with existing building lighting systems to demonstrate <br />compliance with all applicable provisions <br />Provide Building Area Method (LTG-INT-BLD) or Space-By-Space Method (LTG-INT-SPACE) Compliance Form. Dncument maximum <br />allowed and proposed (including existing if applicable) lighting wattage of Addition or Change of Use scope. Provide applicable lighting <br />controls per C405.2 and commissioning of lighting controls per C405.13. <br />Alterations, Renovations and Repairs (C101.4.3.1) <br />� 60% or more of luminaires in space replaced <br />Provide Building Area Method (LTG-INT-BLD) or Space-By-Space Method (LTG-INT-SPACE) Compliance Form. Document maximum <br />allowed and proposed (including existing) lighting wattage of project scope <br />� Less than 60% of luminaires in space replaced <br />Provide Space-by-space Method (LTG-INT-SPACE) Compliance Form. Document existing total wattage in space and proposed <br />(including existing) lighting wattage of project scope <br />� Lamp and/or ballast replacement within existing luminaires only — existing total interior building wattage not increased <br />� New wiring installed to serve added fixtures and/or fixtures relocated to new circuit <br />Provide applicable manual lighting controls (C405.2.1), occupancy sensors (C405.2.2.2), daylight zone controls (C405.2.2.3), specific <br />application controls (C405.2.3), and commissioning of lighting controls per C405.13 <br />� New or moved lighting panel <br />Provide all applicable lighting controls as noted for New Wiring, automatic time switch controls (C405.2.2.1), and commissioning of <br />lighting controls per C405.13. <br />� Space is reconfigured - luminaires unchanged or moved only <br />Provide all applicable lighting controls as noted for New Wiring and commissioning of lighting controls per C405.13. <br />� No changes are being made to the interior lighting and space use not changed. <br />