Laserfiche WebLink
Run Date: 8/10/2016 City of Everett-Public Works Department Cutoff Date: 7/29/2016 <br /> Time: 9:47 AM Contract Estimate Voucher <br /> Project: 321 For Work Order#3395E Contractor: INTERWEST CONSTRUCTION <br /> BROADWAY BRIDGE REPLACEMENT Estimate#21 609 NORTH HILL BOULEVARD <br /> WO 3395E BID:$398,220.00 BURLINGTON,WA 98233 <br /> TOTAL BID:$7,969,043.85 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantify Amount Amount Amount <br /> 0001 Unexpected Site Changes FA 1.00 15,000.00 30,659.4300 30,659.4300 0.0000 30,659.43 30,659.43 0.00 <br /> 0002 Construction Surveying LS 4,000.00 1,00 1.0000 1.0000 0.0000 4,000.00 4,000.00 0.00 <br /> 0003 Mobilization LS 25,100.00 1.00 1.0000 1.0000 0,0000 25,100.00 25,100.00 0.00 <br /> 0004 Class 52 Ductile Iron PipeNOA 4"Water Main LF 83.50 160.00 139.0000 139.0000 0.0000 11,606.50 11,606.50 0.00 <br /> 0005 Class 52 Ductile Iron Pipe for 8"Water Main LF 56.50 340.00 325.4600 325.4600 0.0000 18,388.49 18,388.49 0.00 <br /> 0006 Class 52 Ductile Iron Pipe for 12"Water Main LF 160.00 370.00 385.4000 385.4000 0.0000 61,664.00 61,664.00 0.00 <br /> 0007 Air Valve Assembly EA 3,600.00 1.00 2.0000 2.0000 0.0000 7,200.00 7,200.00 0.00 <br /> 0008 Gravel Borrow Incl.Haul TN 14.50 980.00 575.1800 575.1800 0.0000 8,340.11 8,340.11 0.00 <br /> 0009 Remove&Replace Unsuitable Material CY 90.00 80.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0010 Shoring or Extra Trench Excavation Class B SF 5.00 400.00 330.0000 330.0000 0.0000 1,650.00 1,650.00 0.00 <br /> 0011 Flexible Expansion Joint Filling EA 10,425.00 4.00 4.0000 4.0000 0.0000 41,700.00 41,700.00 0.00 <br /> 0012 Gate Valve,4-Inch EA 1,000.00 1.00 2.0000 2.0000 0.0000 2,000.00 2,000.00 0.00 5 <br /> 0013 Gate Valve,8-Inch EA 1,300.00 4.00 6.0000 6.0000 0.0000 7,800.00 7,800.00 0.00 <br /> 0014 Gate Vale,12-Inch EA 2,400.00 2.00 2.0000 2.0000 0.0000 4,800.00 4,800.00 0.00 <br /> 0015 Hydrant Assembly EA 6,200.00 1.00 1.0000 1.0000 0.0000 6,200.00 6,200.00 0.00 <br /> 0016 Remove&Dispose of Existing Hydrant/Cap EA 1,300.00 1.00 1.0000 1.0000 0.0000 1,300.00 1,300.00 0.00 <br /> 0017 Conduit Pipe,3-Inch Diameter LF 30.00 1,670.00 2,120.0000 2,120.0000 0.0000 63,600.00 63,600.00 0.00 <br /> 0018 Conduit Pipe,4-Inch Diameter LF 41.00 840.00 1,060.0000 1,060.0000 0.0000 43,460.00 43,460.00 0.00 <br /> 0019 Pull Box EA 670.00 4.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0020 Pipe Hanger System LS 39,500.00 1.00 1.0000 1.0000 0.0000 39,500.00 39,500.00 0.00 <br /> 0021 Conduit Hanger System LS 25,900.00 1.00 1.0000 1.0000 0.0000 25,900.00 25,900.00 0.00 <br /> Work Order Totals: 404,868.53 404,868.53 0.00 <br />