Laserfiche WebLink
Run Date: 9/14/2016 City of Everett-Public Works Department Cutoff Date: 8/26/2016 <br /> Time: 10:55 AM Contract Estimate Voucher <br /> Project: 324 For Work Order#3470A Contractor: INTERWEST CONSTRUCTION <br /> SEWER"M"REPLACEMENT& Estimate#19 609 NORTH HILL BOULEVARD <br /> CAPACITY IMPROVEMENTS <br /> WO 3470A BID:$4,917,593.68 BURLINGTON,WA 98233 <br /> TOTAL BID:$10,975,189.68 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item# Description Units Price Quantity Quantity Quantity Quantity Amount Amount Amount <br /> 0001 Surveying LS 21,800.00 1.00 1.0000 1.0000 0.0000 21,800.00 21,800.00 0.00 <br /> 0002 Contractor's Liaison LS 66,675.00 1.00 1.0000 1.0000 0.0000 66,675.00 66,675.00 0.00 <br /> 0003 Mobilization LS 371,000.00 1.00 1.0000 1.0000 0.0000 371,000.00 371,000.00 0.00 <br /> 0004 Traffic Control Labor HR 54.00 1,664.00 6,367.2500 6,367.2500 0.0000 343,831.50 343,831.50 0.00 <br /> 0005 Maintain&Protect Traffic Control LS 62,200.00 1.00 1.0000 1.0000 0.0000 62,200.00 62,200.00 0.00 <br /> 0006 Temp.Sedimentation&Erosion Control LS 36,150.00 1.00 1.0000 1.0000 0.0000 36,150.00 36,150.00 0.00 <br /> 0007 Street Cleaning/Sweeping HR 160.00 218.00 222.5000 222.5000 0.0000 35,600.00 35,600.00 0.00 <br /> 0008 Sawcut Pavement,Final Cut to 6"Thick LF 2.00 3,340.00 5,183.0000 5,183.0000 0.0000 10,366.00 10,366.00 0.00 <br /> 0009 Sawcut Pavement,Final Cut,Additional 1" LF 2.00 3,150.00 13,054.0000 13,054.0000 0.0000 26,108.00 26,108.00 0.00 <br /> Thick <br /> 0010 Grinding/Planing Bituminous Pavement SY 3.50 2,360.00 3,706.2000 3,706.2000 0.0000 12,971.70 12,971.70 0.00 <br /> 0011 Trench Excavation Safety Systems LS 21,200.00 1.00 1.0000 1.0000 0.0000 21,200.00 21,200.00 0.00 <br /> 0012 Roadway Excavation Including Haul CY 44.50 4,190.00 4,475.7500 4,475.7500 0.0000 199,170.88 199,170.88 0.00 <br /> 0013 Construction Geotextile SY 2.50 3,150.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0014 Foundation Material TN 61.00 1,940.00 86.8900 86.8900 0.0000 5,300.29 5,300.29 0.00 <br /> 0015 Roadway Treated Asphalt Base TN 72.00 4,200.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0016 Crushed Surfacing Top Course TN 44.00 170.00 807.4900 807.4900 0.0000 35,529.56 35,529.56 0.00 <br /> 0017 Crushed Surfacing Base Course TN 22.00 9,329.00 17,611.0400 17,611.0400 0.0000 387,442.88 387,442.88 0.00 <br /> 0018 Gravel Borrow,Including Haul TN 21.00 17,187.00 24,699.2400 24,699.2400 0.0000 518,684.04 518,684.04 0.00 <br /> 0019 Controlled Density Fill(CDF) CY 120.00 75.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0020 Cement Concrete Pavement,Road Panels CY 200.00 240.00 0.0000 0.0000 0.0000 0.00 0.00 0.00 <br /> 0021 Temporary Pavement Patch TN 175.00 215.00 253.9100 253.9100 0.0000 44,434.25 44,434.25 0.00 <br /> 0022 Asphalt Class B/HMA 1/2"PG 64-22 TN 77.00 3,080.00 4,089.8300 4,087.8300 2.0000 314,916.91 314,762.91 154.00 <br /> 0023 Concrete Pavement CY 500.00 6.00 50.1600 50.1600 0.0000 25,080.00 25,080.00 0.00 <br /> 0024 Manhole 48-Inch,Type1 EA 4,500.00 20.00 26.0000 26.0000 0.0000 117,000.00 117,000.00 0.00 <br /> 0025 Manhole 54-Inch,Type 1 EA 5,550.00 1.00 1.0000 1.0000 0.0000 5,550.00 5,550.00 0.00 <br /> 0026 Manhole 60-Inch,Type 1 EA 8,700.00 15.00 15.0000 15.0000 0.0000 130,500.00 130,500.00 0.00 <br />