Laserfiche WebLink
O <br />a <br />0 <br />� <br />� <br />- MAPLE STREET— - <br />�° � � b�r% V�1 ��Q, � <br />NEW �9+GHAINLINK FENCE <br />ATOP PROPERiY LME <br />�_ — -- - - - _ <br />�� �IXISTING 6' WIDE CONCRETc` SIDEWALK . _ <br />J�.i��� <br />�'�. -..� .�—e..�.�..�:� �-�-�-- -- — <br />_ T 10 WIDE LANDSCAPE �:�, 10' BU�FFER ARD ApoE � <br />� BUFFER AREA I <br />�° a r TYPE III T7PE m <br />id,_o,� � 4�_a„ �� 24,_0, <br />� + <br />� SLOPE'nLOT� <br />� 7_5 12 <br />ITOWARDS SWALE <br />I NEV <br />a <br />z^ <br />o. <br />ol <br />�� �-- <br />I ,�":A',��:''=:yi:=::"�::."' <br />,� , <br />I <br />I - _ <br />I. <br />IS <br />I ~` <br />, <br />I lr <br />NEW 48° WIDE <br />LONC. WALK w/ <br />IXIST CONC. STEPS <br />6' rllDE 54JALLGW — <br />6RA55 LINED SWALE <br />I � � � CATCN BASIN — �nPE � <br />� � � (SLOPE TO CRAIN) I � �+TLN BASIN <br />� _ o �> <br />I � EXISTIN6 d6� CFIAINLINK FENCE w/ GATeS � <br />�� a'm wER��ow �iPe } <br />- I TO fXISTING SEWER . I <br />; I srueour <br />I �� IXIS7ING ASPHALT ` . I <br />- APRGN dI <br />= I �� <br />— —�-- -- —50.00'J- -- <br />ALLEY WAY <br />Stormwater Runoff Equation Parcel l�To.: 00593663801400 Project Scope of Work: <br />Q= Storm Water Runoff (CF per second) Sectio�i To���ushi� Rangc t���u�ter <br />C= Ceefficient of Runoff 0.90 ry 1. Construct a new parking lot <br />I= Rainfall Intensity (inches per hour) 0.005594 20 �.9 05 S.E. 2. - <br />A= Area of Drainage Zone (in acres� O.115932 P10jCCf Sf�iriGlalC�S 3. <br />Q= C' I* A P>iiildinX Code IRC 2012 Edition 4• <br />F,nergy Code WSEC (by WSU) 2012 Edition 5. <br />Q=.90x.006x.116 Flooi I.oadi�lg 40psf LL I 12psf DL = 52psf <br />3 f:oof Loaditig 25psf LL/ 17psf DL = 42psf <br />Q = 0.0006 ft /96.23 =.058gpm <br />Juriscliction City of Everett <br />.058 x 15 = 0.866 Volume Lega1 �)escription Cuf and Fill <br />SWALWEl1S 2ND ADD BLK 638 �-00 - LOTS 14 k 15 Crawlspace cut: W x L x D <br />- Foundation bockfill: 'r4 x L x D <br />Slob-on-grade cut: W x L x D <br />CI�1, F.�rLfill� UJ v I v � <br />� <br />Siie Plan PLAN Nox�,x <br />__ Scale:1"=20' <br />ENT OL HEN <br />T 0 ,T ��) <br />S i <br />t <br />6" OR S" PVC 24�� <br />FACTORY TEE <br />� <br />o ry <br />� <br />� <br />FROM SD F <br />�z <br />� <br />v R <br />v <br />� <br />321I <br />6" OR 8" PVC <br />PWG <br />� --- — -- <br />L�I �� <br />MAX <br />i TO SD OR CS� _ <br />� ADAPTOR OR PIFE JOINT <br />6° OR 8" PVC O1'7i- <br />SAND COLLAR OR <br />COR-N-SEAL ?YP <br />6" OR 8" PVC PIP`: AS <br />REQ'D. <br />TYFE 'B' CB, SEE ;'.� <br />DRAWING 4C3 <br />F �"1 <br />G ...y i�Yy � 0lw' '� �- �-� <br />P" ly�l.� ��'� 1��f; ��k'�6'�0� Y.��i �.t..._t ,; f 1.i;_-� <br />� ��; <br />�Y ,f " - <br />����� ?:�� -�L'16 - - -_ <br />CI ��' ��� ������ �� r, ��, �I? � ti�', ��� o�':i i' <br />��. <br />Erosion Control Notes <br />Hardscape Lot Cover�ge <br />Ezisting Hardscape Area: 1,U00.00 sqft <br />Nea� Hardscape Area: 3,990.00 sqft <br />— + ��.0� Sqfl <br />TOTAL HARDSCAPE AREA: 4,990.00 sqft <br />PROPERTY AREA = 6,000.00 sqft <br />PROPERTY HARDSCAPE AREA 53.17% <br />Average Grade Storm Water Contr�l <br />yd� Existing grode is an average of 1/4':12 Slope of new asphalt paricing areo to a new <br />yd� slaped from the north to the south property installed type 1 catch basin <br />lines. <br />Yd 3 <br />Yd 3 <br />Soil Amendment Notes cont.: <br />1. The contractor shall provide periodic street cleaning to remove any OPTION 3- Import �soil Meetin�c Orqanic �latter Content Standards• <br />sediment trocked off the site. Scarify or till subgrade in two directions to 6-inches depth. Entire <br />2. The contractor shall perform routine inspection and maintenance of all surface should be disturbed by scarification. Do not scarify within drip <br />installed erosion and sediment control BMPs, especially after storms. line af existing trees to be retained. <br />3. Appropriate measures shall be taken to stop sediments from entering wthin stormwater Drainage System locations or Landscaped Areas (10- <br />waterways if the proposed BMPs fail. percent organic content) - Use imported topsoil mix containing 10- <br />4. Bare and/or disturbed soils shall remain uncovered and/or unstabilized Percent organic matter (typically around 40-percent compost). Soil <br />for no more than 2-days from October 1 through April 30, and for portion must be sand or sandy loam as defined by the USDA. Place 3- <br />no more than 7-days from �iay 1 through September 30. inches of imported tapsoil mix on surface and till into 2-inches of soil. <br />Place 3-inches of topsoil mix on the surface. Rake smooth and remove <br />surface rocks over 2-inches diameter. Mulch pianting beds with 2-inches <br />Basie Soil Atnendment NOtes: oforganicmulch. <br />OP�ON t- Amend Existinc�Soils in Place: wthin Lawn Areas (5-percent organic content) - Use imported topsoil <br />mix containing 5-percent organic matter (typically around 25-percent <br />Scarify or till existing subgrade to 4-inches depth (or to depth needed compost). Soil portion must be sand or sandy loam as defined by the <br />to achieve a total depth of 12-inches or uncompacted soil after USDA. Place 3-inches of imported topsoil mix on surface and till into <br />calculated amount of amendment is added, see specific subsections 2-inches of soil. Water or roll to compact soil to 85-percent maximum. <br />below). Entire surface should be disturbed by scarificatian. Do not scarify Rake to level, and remove surface rocks larger than 1-inch diameter. <br />within drip line of existing trees to be retained. <br />wthin Stormwater Drainage System locations or Landscape Areas (10- <br />percent organic content) - Place and rototill 3-inches of composted <br />moterial into 5-inches of soil (a total depth of about 9.5-inches, for <br />a settled depth of 8-inches). As noted previously, subsoil's below this <br />layer shauld be scarified at least 4-inches, for a finished minimum `� 1-.�.• <br />depth of 12-inches of uncompacted soil. Water or roll to compact soil _.. �, �h�� ���6��� ,_ �, ;"1 <br />to 85-percent of maximum. Rake to level, and remove surface woody �C�f����3(��E�,'� �,��; �` <br />debris and rocks larger than 1-inch diameter. � <br />OPTION 2- Stockpile Site ToRsoils Prior to Grading for Reapplication: l�� , i r -� _ <br />If placed topsoil plus compost or other organic material will amount to ,'"'�� <br />;�¢ � �� <br />1� _�. _:_ <br />less than 12-inches: scarify or till subgrade to depth needed to achieve <br />12-inches of loosened soil ofter topsoil and amendment are placed. <br />Entire surface should be disturbed by scarification. Do not scarify within % � I ��I ��'j <br />drip line of existing trees to be retained. <br />Stockpile and cover soil with weed barrier material that sheds moisture P 1 o j e C t D i Y' e C t O r y: <br />yet allows air transmission, in approved location, prior to grading. A�,�„a��, sw<<��a�E�9����e <br />Replace stockpiled topsoil prior to planting. Advmce�Mma�ernent - <br />F,o;�� �do-� .�a,� <br />Within Stormwater Drainage System locations or Landscaped Areas (10- 2717 �P�e Street - <br />percent organic content) - Place and rototill 3-inches of camposted Everett Washirgtcn 98201 - <br />material into 5-inches of replaced soil (a total depth of aboui 9.5- `�`" `�°`°�` <br />inches, for a settled depth of 8-inches). Subsoiis below this layer should <br />be scarified at least 4-inches, for a finished minimum depth of 12- pj'��"`°��t�� �-�,��� `"� `�'�'���"��`> <br />inches of uncompacted soil. Rake beds to smooth and remove rocks u.,�, - Aaz,m <br />larger than 2-inches in diameter. Mulch areas with 2-inches of organic �- 91st Ave N.E, E5Q2/53 - _ <br />mulch or stockpiled duff. Lake Stevens, WQshirgtcn 98258 - <br />�Iwthir Lawn Areas (5-percent organic content) - Place and rototill 1J5 `""" O ����� <br />Rick Fuller 425 508-2840 <br />j inches of composted material into 6.25-inches of replaced soil (a total �� my a:;_� ��,�y. �m��� ��:r <br />ammendment depth of about 9.5-inches, for o settled depth of 8- - - <br />inches). Subsoils below this layer should be scarified at least 4-inches, Ad�.� �aa�===: <br />Ifor a finished minimum depth of 12-inches of uncompacted soil. Water - <br />or roll to compact soil to 85-percent of maximum. Rake to level, and - - — <br />remove surface woody debris and rocks larger than 1-inch in diameter. _`°" `°"�°" <br />N� o <br />U � N � <br />- � M Q� <br />N o ln � r Z <br />� <br />� � N ry M � <br />� �� � <br />� W w N U <br />�� -Q � W <br />cn Z�'LL O <br />o w c �,•, a <br />U > a� �op <br />� a a�i fl� 2 <br />� N fiJ N (j <br />� <br />O pi Y �f1 J <br />d M tp ' <br />O --J N � <br /><` ) � O <br />U <br />a <br />� � <br />Project: <br />Tifle: <br />Parking Lot <br />Layout Plan <br />Dra�vn: <br />D. Almond <br />Daie: <br />01/15/2016 <br />�ion: <br />� � <br />�3 <br />