Laserfiche WebLink
PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425) 257-8810 <br />Date: 5/17/2013 <br />Public Works Permit #: PW1305-008 <br />Building Permit #; <br />Planning Reference #: <br />Public Works Fee $: $ 45.00 <br />Other $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />JIM SCHAFFER MARC CASTORIANO <br />806 ALPINE DR 6306 61stAVE S.E. <br />EVERETT Wq 98203 SNOHOMISH WA 98290 <br />PHONE: 4255086370 PHONE: 2062409766 <br />TAX PARCEL ID # SITE ADDRESS: 1626 EAST MARINE VIEW DR <br />DESCRIPTION OF PROPOSED WORK: <br />LANDSCAPING/PAVING <br />(5/17/2013 10:43 AM BES) <br />PROPOSE NURSERY WITH LANDSCAPING AND PAViNG FOR PARKING <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. Ail work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 r-- <br />4. NO DIRT, MUD, ROCKS OR DEBRIS TO BE TRACKED ONTO ROADWAY. <br />5. PAVE DRIVEWAY UP TO PROPERTY ENTRANCE AS PROPOSED. <br />6.PAVE PARKING PER CITY STANDARD. <br />7. CONTACT CITY INSPECTOR RANDY ALLEN 425-339-7403 PRIOR TO STARTING WORK. <br />for Co <br />FINAL INSPECTION <br />Approved as Constructed <br />�� ������ <br />Date / <br />Date <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-wa use hereto applied for and further agrees <br />to remove same,xa r�otice from the City and to re lace <br />public prope �i m g d th eby. <br />� - S/ <br />Signature of Applicant <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />