Laserfiche WebLink
PUBLIC WORKS PERMIT Date: 5/17/2016 <br />Public Works Permit #: PW1605-018 <br />City of Everett Public Works Department <br />3200 Cedar Street Parent Permit #: <br />L� ��"�`r Everett, WA 98201 <br />Planning Reference #: <br />(425) 257-8810 <br />Public Works Fee $: $ 85.00 <br />Other $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />CONTORAVDIS CHRIS <br />4131 RUCKER AVE <br />EVERETT �/�/q 98203 <br />RANGEL ISMAEL <br />4131 RUCKER AVE <br />EVERETT WA 98203 <br />PHONE: 4253798969 PHONE: 4257507714 <br />TAX PARCEL ID # 00582101501500 SITE ADDRESS: 4131 RUCKER AVE <br />REVISE ROW & SITE FOR OUTDOOR SEATING AT RESTAURANT <br />EL TAPATIO RESTAURANT <br />CREATE OUTDOOR SEATING ALONG RUCKER AVE. <br />SUBJECT TO FIELD INSPECTION. <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />4. Site Civil Work to be done per plans approved by the City of Everett Public Works <br />Department dated 5/27/2016. <br />5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior <br />to starting construction and with other inspection requests. <br />6. Install erosion control measures per City of Everett Standards for small parcels and <br />remove upon completion of the project prior to final approval of the permit. <br />7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto <br />roadway. <br />8. Protect all existing underground utilities during construction. <br />9. All work constructed within the public right-of -way must be removed or relocated at <br />the owner's expense if the City ever requires use of the right-of-way for municipal <br />purposes. <br />10. A landscape inspection is required by the Planning Department prior to final <br />inspection by the Public Works Inspector. Please contact Teresa Weldon at � � <br />425-257-8731. <br />Public Works Permit Fee Breakdown: <br />Concrete Paving.........$45.00 <br />PW Plan Review........$20.00 <br />PW Site Inspection.....$20.00 <br />Approved for Construction <br />FINAL INSPECTION <br />Approved as Constructed <br />Date <br />Date <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harmless the <br />City of Everett from any and all claims for damages, costs, expenses, or <br />causes of action that may arise because of installation and maintenance of the <br />improvement or other right-of-way use hereto applied for and further agrees to <br />remove same upon notice from the City and to replace public property <br />damaged thereby. <br />Signature of Applicant <br />Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />