Laserfiche WebLink
• • <br />Geotechnical Fngineering Evaluation NGA File No. 916915 <br />Pepe Retainin� Wall April 27, 2015 <br />Everett, Washington Page 14 <br />We recommend that NGA be eetained to p�•ovide monitoring and consultation services during <br />construction to confirm that the conditions encountered are consistent with those indicated by the <br />explorations, to provide recommendations for design changes should the conditions revealed during the <br />work differ from those anticipatcd, and to evaluate whether the work activities co�nply with contract plans <br />and specifications. We should be contacted a inii�imuin of one week prior to construetion activities and <br />could attend pre-construction meetings if requested. <br />All people �vho own or occ�ipy homes on or near hillsides sllould realize that landslide movcments are <br />always a possibility. The landowner should periodically inspect the slope, especially after significant <br />stot•m evei�ts. If distress is evident, a geotechnical engineer should be contacted for adviee on <br />remedial/preventative meas�ires. The probability that landslidinb will occur is substantially reduced by <br />the proper maintenance of drainage control measures at the site (the runoff from the roofs should be led to <br />an approved discl�arge point away from the slope). Therefore, the homeowner should take responsibility <br />for performing such maintenance. Consequently, we recommend that a copy of our report be provided to <br />any future homeowners of the property if the home is sold. <br />Within the limitations of scope, schedule, and budget, our services have been performed in accordance <br />with generally accepted geot�echnical engineering practices in effect in this area at the time this report was <br />prepared. No other warranty, expressed or implied, is made. Our observations, findings, and opinions are <br />a means to idcntify and reduce the inherent risks to the owner. <br />••� <br />NELSON GEOTECHN/CAL ASSOCIATES, INC. <br />