Laserfiche WebLink
• <br />• <br />NELSQN GEQTECHNICAL <br />I�I �A � .Assoc�Ar�s, �H�. <br />GEOTECHNICAL EI�tGiNEERS 8c GEOLQC�sISTr'a <br />41ain OFfice <br />t 73 i I— 135'�' Ave: NE, A-SQO <br />�'v'oociinville, WA 98072 <br />(425) 486-i 6G9 � EAX (425) A31-2J 10 <br />August 14, 2015 <br />Mr. Mark Pepe <br />2572 Point Marie Drive <br />Henderson, NV 89044 <br />Engincering-Gec>logy Hranch <br />5526 [ndustry Lane, �2 <br />f:a,et Wenatchee, 1NA H8802 <br />(S09} 665-7696 • FAX {509) G65-7692 <br />� ���o�� �' � <br />AUG i 8 2015 <br />Design Review and Addendum to Geotechnical Engineering Evaluation Report <br />Pepe House Foundation and Retaining Wall Repairs <br />4937 Sea Breeze Way, Everett, Washington <br />NGA File No. 9169B 15 <br />CITY OF EVERETT <br />Perr�!it Servi�es <br />Dear Mr. Pepe: <br />As requested and authorized by you, Nelson Geotechnical Associates, Inc. (NGA), has reviewed the <br />design of the subject project for consistency with our geotechnical report entitled "Geotechnical <br />Engineering Evaluation, Pcpe Retaining Wall, Everett, Washington," dated April 27, 2015. <br />INTRODUCTION <br />NGA conducted a site evaluation for a failing retaining wall down slope of an existing residence located <br />at 4937 Sea Breeze Way in Everett, Washington. Although specific to the retaining wall, NGA noted in <br />its report that the house foundation appeared to be settling and we suggested that the possible settlement <br />issues be assessed and remediated as needed. The engineering design firm, CT Engineering, Inc. (CT) <br />was tasked with this assessment and has developed a design that includes both stabilizing a portion of the <br />house foundation and repairing the retaining wall into one project. <br />This letter addresses coinments made by the City of Everett, Public Works Department, Plan Check <br />Number CW 1506-005, in a letter dated August 3, 2015, related to their design review of the original <br />pennit submittal package and summarizes our review of the geotechnically-pertinent aspects of the <br />project in the documents submitted to us; and amends our conclusions, opinions, and recommendations as <br />needed that are relevant to the project. <br />