My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/11/30 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/11/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 12:01:02 PM
Creation date
12/16/2016 11:59:00 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/30/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II EVERETT CITY COUNCIL AGENDA I1',M COVER SHEET <br /> PROJECT TITLE: <br /> Change Order No. 3 with KLB Briefing COUNCIL BILL# <br /> Construction,Inc. for the East Proposed Action Originating Department Public Works <br /> Grand Avenue Sewer X Consent Contact Person Tom Fuchs <br /> Replacement& Storm Water Action Phone Number 425-257-8931 <br /> Separation Project First Reading FOR AGENDA OF November 30,2016 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Tnitialed by: <br /> Department Head <br /> CAA <br /> Council President Ir' <br /> Location Preceding Action Attachments Department(s)Approval <br /> Riverside Neighborhood 7/9/2014 Bid Change Order No. 3 Public Works <br /> in Northeast Everett 9/17/2014 Award <br /> 10/22/2014 BNSF <br /> License Agreement <br /> Amount Budgeted $6,500,000.00 Account Number(s): UP 3398 <br /> Expenditure Required $1,840.00 <br /> Budget Remaining $149,636.21 <br /> Additional Required $0.00 <br /> DETAILED SUMMARY STATEMENT: <br /> This project includes construction of a new pipe conveyance system to separate, collect, and treat storm- <br /> water from the existing combined sewer system along East Grand Avenue and associated locations. <br /> Change Order No. 3 modifies two items by deleting 452 cubic yards of Control Density Fill and deleting the <br /> lump snm item to Remove and Replace the Generator Pad at Lift Station#32. Change Order No. 3 also adds <br /> four new items to the contract as follows: 1)Install 590 square yards of Pervious Concrete at intersection <br /> bulb-outs,2) &3)to install 18 square yards of Private Walkways and 8 each Concrete Steps,both behind <br /> existing City sidewalks and 4)to Remove and Replace the Generator Pad at Lift Station#32 at a new reduced <br /> lump sum price. Change Order No. 3 also adds 28 additional working days to contract time. <br /> • <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Mayor to sign Change Order No. 3 with KLB Construction,Inc. for the East Grand Avenue <br /> Sewer Replacement& Storm Water Separation Project in the amount of$1,840.00 plus Washington State <br /> sales tax. 219 <br />
The URL can be used to link to this page
Your browser does not support the video tag.