My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/11/30 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/11/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 12:01:02 PM
Creation date
12/16/2016 11:59:00 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/30/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: East Grand Ave Sewer System Replacement and Storm Water Separation <br /> Change Order No. 3 <br /> Change Order Effective Date:November 8,2016 <br /> JUSTIFICATION: <br /> Schedule B: <br /> Modified Bid Items: <br /> Bid Item B-14- Control Density Fill.The quantity of control density fill was not required nearly to <br /> the extent anticipated during the design and allowed for in the bid proposal. <br /> Bid Item B-58-Remove&Replace Generator Pad. This bid item is being deleted as a result of the <br /> added work at Lift Station#32. A portion of the work required under this bid item was done by City of <br /> Everett forces and the rest of the work was completed by KLB Construction forces. The revised work <br /> effort required by KLB Construction is being paid under new bid item B-69—Remove&Replace <br /> Generator Pad. <br /> New Items: <br /> Item B-66—Pervious Concrete. At the intersections of 21St,22nd,23rd and 24th Streets and East <br /> Grand Avenue,where curb bulb-outs were added to make space for the new Stormwater treatment <br /> units,pervious concrete is being used in these areas between the sidewalk and new curb. This is in lieu <br /> of topsoil and grass which would become a maintenance burden for the City or adjacent property <br /> owners.Pervious concrete is expected to require very little maintenance and is consistent with the <br /> objectives of this project which is to reduce storm water runoff in the sewer system. The cost for <br /> pervious concrete includes the removal of existing materials to a depth of 1 foot, and placement of 4- <br /> inches of pervious concrete over 8-inches of free draining gravel. <br /> Item B-67—Private Walkways and item B-68—Concrete Steps. Justification for these two items <br /> was necessary as the new curb and sidewalk grade elevations changed slightly along various areas of <br /> East Grand Avenue,requiring height adjustments to the private walkways that abut the new sidewalk <br /> grade. In certain instances new concrete steps were incorporated into these private walkways to aid in <br /> matching grade of new sidewalks. <br /> Item B-69—Remove&Replace Generator Pad. This bid item is being added as portion of the work <br /> required under original bid item#58 was completed by City of Everett forces,with the rest of the work <br /> completed by KLB Construction forces. The revised work effort required by KLB Construction is paid <br /> for under this new bid item. <br /> CONTRACT TIME: <br /> Twenty eight(28)working days are being added to the contract time by change order#3 as a result of <br /> structural modifications made to Lift Station#32 to raise the height of the existing wet well structure. <br /> The hatchways requested by the City's Technical Service Group,in the top concrete slab above the wet <br /> well of the lift station,had significant long lead procurement time frames,which resulted in the need to <br /> add these additional 28 working days. <br /> Page 4 of 4 <br /> 223 <br />
The URL can be used to link to this page
Your browser does not support the video tag.