My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/11/30 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/11/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 12:01:02 PM
Creation date
12/16/2016 11:59:00 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/30/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTTFICATE OF COMPLETION <br /> Project: Sewer System Replacement&Capacity Improvements Sewer"M" <br /> Contractor: Interwest Construction Inc. <br /> Work Order No. UP 3470 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project,within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> /9_/ , 1 I I l v <br /> Public/irks rks Di ec�r for .te <br /> Dave Y avis <br /> Approved by: <br /> Mayor, City of Everett Date <br /> Ray Stephenson <br /> Attest: <br /> City Clerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: <br /> Jim lies,City Attorney <br /> Date • <br /> 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.