My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016/11/30 Council Agenda Packet
>
Council Agenda Packets
>
2016
>
2016/11/30 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 12:01:02 PM
Creation date
12/16/2016 11:59:00 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/30/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CER111-4CATION <br /> DATE: September 8,2016 ADDRESS: 609 North Hill BLVD <br /> CONTRACTOR: Interwest Construction CITY/STATE: Burlington, WA 98233 <br /> PROJECT TITLE: Broadway Bridge Replacement WORK ORDER NO. PW3395 <br /> DA 1:E WORK COMPLE 1'E: April 15,2016 FINAL AMOUNT: $7,800,022.66 <br /> Exclusive of State Sales Tax <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work <br /> performed and material furnished to the City of Everett,that the same or any part thereof has not been paid, and <br /> that I am authorized to sign for.the claimant; that I have not rented or purchased any equipment or materials <br /> from any employee of the City; I further certify that the attached final estimate is a true and correct statement <br /> showing all the monies due me from the City of Everett under this contract; that I have carefully examined said <br /> final estimate and understand the same and that I hereby release the City of Everett from any and all claims of <br /> whatsoever nature which I may have, arising out of the performance of said contract, which are not set forth in <br /> said estimate. <br /> X X <br /> President <br /> CONTRACTOR TITLE <br /> Interwest Construction <br /> Subscribed and sworn to before me this 15th day of September ,2016 <br /> X CZ~-- mid ,Olh !'Gt- -c <br /> No ublic' I <br /> j fit 6t4tate of Washington,residing at Bellingham <br /> .7Z * TAS&�. <br /> aen: moo - sp= <br /> NAS <br /> ' <br /> ® J8L� o®�` PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> s�®17):`;I/NE/6 2p2 � e% <br /> I Cer * + final estimate to be <br /> based upon% . measurements and to <br /> be true and correct. APPROVED I.te: j , U kcjCAra-- <br /> x <br /> X i/ <br /> Construction Manager Public Wo T i irectoor <br /> Tom Fuchs Dave Davis <br /> INSTRUCTIONS <br /> • <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor' <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> 58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.